Presentation is loading. Please wait.

Presentation is loading. Please wait.

Distances to primary schools in Austria

Similar presentations


Presentation on theme: "Distances to primary schools in Austria"— Presentation transcript:

1 Distances to primary schools in Austria
Geographical Information Systems for Statistics 16-17 Mar 2006 Distances to primary schools in Austria Albrecht Wirthmann Eurostat, Unit D2 / GISCO Luxembourg, BECH A3/31 Tel: GISCO working group meeting 23-24/10/2003

2 Structure of the presentation
Background Method Results Conclusions GISCO working group meeting 23-24/10/2003

3 Background GISCO working group meeting 23-24/10/2003

4 Background Support to unit E1 “Agricultural Statistics – Methods” on characterisation of rural areas Indicators for describing rural areas Length of traffic network Accessibility to public services, i.e. primary schools GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

5 Method Input data Disaggregated population density map (see last years presentation) Location of primary schools Digital Elevation model NUTS regions GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

6 Method Approach Calculation of shortest distances to primary schools
Delimitation of minimum distance areas around schools Consideration of "obstacles", i.e. mountains Population weighted mean distance to primary schools Summarization by administrative units (NUTS) Comparison of indicator values GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

7 Method Approach No consideration of traffic network
Necessary data currently not available But: Primary schools normally in walking distance GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

8 Method Communes and schools
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

9 Method Commune boundaries and road network
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

10 Method Disaggregated Population Map
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

11 Method Schools, communes, population
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

12 Method Digital elevation model and schools
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

13 Method Euclidean Distance Allocation
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

14 Method Euclidean Distance Allocation
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

15 Method Euclidean Distances to schools
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

16 Method Calculation weighted distance average Weight by population
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

17 Method Weighted Distance Average by Commune
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

18 Method Weighted Distance Average by NUTS 3
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

19 Conclusions Approach is feasible with restrictions
“Short distance” services Lack of disaggregated map for population at appropriate age class (6-10 years) Regional Differences can be observed Settlement structure? We would like to thank Statistics Austria for supplying the school locations GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003

20 Danke für Ihre Aufmerksamkeit
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003


Download ppt "Distances to primary schools in Austria"

Similar presentations


Ads by Google