Download presentation
Presentation is loading. Please wait.
Published byThomasine Winifred Miller Modified over 5 years ago
1
Distances to primary schools in Austria
Geographical Information Systems for Statistics 16-17 Mar 2006 Distances to primary schools in Austria Albrecht Wirthmann Eurostat, Unit D2 / GISCO Luxembourg, BECH A3/31 Tel: GISCO working group meeting 23-24/10/2003
2
Structure of the presentation
Background Method Results Conclusions GISCO working group meeting 23-24/10/2003
3
Background GISCO working group meeting 23-24/10/2003
4
Background Support to unit E1 “Agricultural Statistics – Methods” on characterisation of rural areas Indicators for describing rural areas Length of traffic network Accessibility to public services, i.e. primary schools GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
5
Method Input data Disaggregated population density map (see last years presentation) Location of primary schools Digital Elevation model NUTS regions GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
6
Method Approach Calculation of shortest distances to primary schools
Delimitation of minimum distance areas around schools Consideration of "obstacles", i.e. mountains Population weighted mean distance to primary schools Summarization by administrative units (NUTS) Comparison of indicator values GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
7
Method Approach No consideration of traffic network
Necessary data currently not available But: Primary schools normally in walking distance GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
8
Method Communes and schools
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
9
Method Commune boundaries and road network
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
10
Method Disaggregated Population Map
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
11
Method Schools, communes, population
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
12
Method Digital elevation model and schools
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
13
Method Euclidean Distance Allocation
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
14
Method Euclidean Distance Allocation
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
15
Method Euclidean Distances to schools
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
16
Method Calculation weighted distance average Weight by population
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
17
Method Weighted Distance Average by Commune
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
18
Method Weighted Distance Average by NUTS 3
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
19
Conclusions Approach is feasible with restrictions
“Short distance” services Lack of disaggregated map for population at appropriate age class (6-10 years) Regional Differences can be observed Settlement structure? We would like to thank Statistics Austria for supplying the school locations GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
20
Danke für Ihre Aufmerksamkeit
GISCO has had several different tasks during the last year. As many of the points will be presented later, I will concentrate on the update of the database including the quality control, the Farm Structure Survey project, the TANDEM project, the GIS WG for the WFD and briefly explain about the various GIS projects to which GISCO participates. GISCO working group meeting 23-24/10/2003
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.