5/10/2019 MSC briefing Cascina 11-Dec 2006 wwwwwww
2
Two main guidelines: 1) lighten expert-operation load
5/10/2019 Two main guidelines: 1) lighten expert-operation load 2) focalize stratedies and tests HW Performace Items Backup-solutions SW Strategies Tests EM-MSC wwwwwww
3
5/10/2019 I EM-MSC wwwwwww
4
transversal coil check implementation of qz (left pending)
5/10/2019 HW All the available handles to make possible flexible and specially featured strategies to cope with environmental and commissioning issues have been implemented. Just few open issues: x damping …. scheduled shifts: 1 Target: transversal coil check implementation of qz (left pending) EM-MSC wwwwwww
5
“(dinamically) soft download” almost ready
5/10/2019 “(dinamically) soft download” almost ready Issues to complete it: Automated suspension re-centring Operator interface up-date SW scheduled shifts: 1 + off-line work (…) Target: to allow tests of environmentally featured filters during any commissioning shift EM-MSC wwwwwww
6
5/10/2019 II EM-MSC wwwwwww
7
CIPC tested using the scheme 4G+2NoG: incoherent behavior of
5/10/2019 CIPC tested using the scheme 4G+2NoG: incoherent behavior of zCorr, F0, when suspensions with NoG are excited Shifts spent: 3 (not so many…) Siesta modeling proposed in parallel to std control design CIPC Modeling/test phase started, but no clear understanting so far. Quite reasonably this matter is combined with the spectral blending of Pos versus Acc Strategies LP/HP Modeling/test phase started, but no solution addressed yet. Few hours of shift taken (n.s.m.) It was foreseen from the beginning both GIPC and std ID will improve EM-MSC wwwwwww
8
Dynamical shift scheduling difficult…
5/10/2019 Dynamical shift scheduling difficult… Basically 3 shift/week seem reasonable until Tests EM-MSC wwwwwww
9
HW SW Performace Items Backup-solutions Strategies Tests EM-MSC-221106
5/10/2019 HW Performace Items Backup-solutions SW Strategies Tests EM-MSC wwwwwww
10
Vdamp vertical damping (y) implemented in 6 towers
5/10/2019 vertical damping (y) implemented in 6 towers basically the same filter used for horizontal ID 70 mHz). only top sensor used (F0) mseism rms reduction (NS-NS Horizon > 0 last night). gain optimization under study short towers ? (next step, probably, urgent) EM-MSC wwwwwww
11
Vdamp vertical damping (y) implemented in 6 towers
5/10/2019 vertical damping (y) implemented in 6 towers basically the same filter used for horizontal ID 70 mHz). only top sensor used (F0) mseism rms reduction (NS-NS Horizon > 0 last night…). gain optimization under study short towers ? (next step, probably, urgent) EM-MSC wwwwwww
12
GIPC Tested using all GC signals (PR,BS,NE,WE) at steps 1, 4, 12
5/10/2019 Tested using all GC signals (PR,BS,NE,WE) at steps 1, 4, 12 yesterday night data under study > Mandatory issue: reduction of seismic (sea) re-injection > A shift is following EM-MSC wwwwwww