Download presentation
Presentation is loading. Please wait.
1
802.21 Liaison Report Date: 2012-01-20 Authors: January 2012
January 2012January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 January 2012 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
2
Abstract Liaison report on 802.21 as presented to 802.11 January 2012
September 2008 January 2009September 2008 January 2012January 2009September 2008 doc.: IEEE /xxxxr0 January 2012 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
3
802.21 Discussion on next steps for 802.21 January 2012
September 2008 May 2008 January 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2012 802.21 Discussion on next steps for Discussed and developed a PAR for Group Management PAR approved and will be submitted to ExCom for March meeting Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
4
September 2008 May 2008 January 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2012 802.21a Received from ExCom in November conditional approval to publish. Third Sponsor ballot on IEEE a D6.0 closed December 8, Results: 63/1/0/ % 2 comments received; no new comments, no changes to draft Conditional approval conditions met. Submitted to RevCom Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
5
September 2008 May 2008 January 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2012 802.21b Received from ExCom in November conditional approval to publish. Third Sponsor ballot on IEEE b D6.0 closed December 8, Results: 60/2/0/ % 1 comment received; no new comments, no changes to draft Conditional approval conditions met. Submitted to RevCom Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
6
802.21c Single Radio Handover Task Group Chair: Junghoon Jee (ETRI)
September 2008 May 2008 January 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2012 802.21c Single Radio Handover Task Group Chair: Junghoon Jee (ETRI) January Merging Plan for Pull Key Distribution srho, Yoshihiro Ohba (Toshiba) Access Information Database Design for 4G , Charles E. Perkins (tellabs) Proposal Discussion srho, Anthony Chan (Huawei) srho, Hyunho Park (ETRI) Looking at WG Ballot of draft in March 2012 Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
7
References This document All Documents
September 2008 May 2008 January 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2012 References This document Thanks to Subir Das, Chair of All Documents Current draft is in the members-only area Members_Only_Area members log in using username and password Slide 7 Clint Chaplin, Samsung Electronics Page 7 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.