Draft Bond Work Plan A Presentation to the

Similar presentations


Presentation on theme: "Draft Bond Work Plan A Presentation to the"— Presentation transcript:

1 Draft Bond Work Plan A Presentation to the
Linden Unified School District Board of Education Presented August 15, 2018 By fB2 Solutions

2 Ballot Measure Correlations
BACKGROUND Included in the process for bond election approval was the need to create a ballot statement which identifies the project types that the LUSD will undertake should Measure G pass Those project types are cataloged here in order to insure that the items included in the Draft Bond Work Plan correlate directly with the language of the ballot statement Ballot Measure Correlations ITEM Project Type 1 Modernize Classrooms 2 Improve Safety/Security 3 Modernize/Construct/Equip School & Support Facilities 4 Update Athletic Fields 5 Parking/Energy 6 Payoff Outstanding Liabilities LUSD Draft Bond Work Plan 8/15/18

3 Draft Bond Work Plan – Phase #1
Site/Project Ballot Measure Correlation COP Debt Service 6 Waverly Parking Lot Addition 5 Campus Security 2 Glenwood Linden El Waverly Elementary School Waterloo Linden High School Linden High School Home Ec CTE Play Apparatus Replacement 3/2 Waverly Athletic Field Lighting 4 Stadium Track Stadium Turf Restroom Remodels 3 Prop 39 HVAC Replacements LUSD Draft Bond Work Plan 8/15/18

4 Draft Bond Work Plan – Phase #2
Site Ballot Measure Correlation Linden High School Art Room Modernization 1/3 Linden Elementary Science Classroom Addition 3 Restroom Additions Waverly MPR Modernization Shade Structures (Solar as possible) 5/3 Glenwood Linden El Waverly Elementary School Waterloo Pride Site Ballot Measure Correlation Portable Replacement 3 Glenwood Linden El Waverly Elementary School Waterloo Linden High School Science Classroom Modernization 1 Foyer Construction - LHS West Gym 3/2 Field House Construction - LHS Linden High School Pool Renovation LUSD Draft Bond Work Plan 8/15/18

5 Draft Bond Work Plan – Phase #3
Site Ballot Measure Correlation Stadium Restroom and Snack Bar Modernization 3/2 Window Replacement 3 Glenwood Linden El Waverly Elementary School Waterloo Linden High School HVAC Replacements 3/5 Pride Admin Site Ballot Measure Correlation Roof Replacements 3 Glenwood Linden El Waverly Elementary School Waterloo Linden High School Exterior Paint Site Ballot Measure Correlation Flooring 3 Glenwood Linden El Waverly Elementary School Waterloo Linden High School LUSD Draft Bond Work Plan 8/15/18