Project GabE ECE 135 – Spring 2005 Presentation 10

Similar presentations


Presentation on theme: "Project GabE ECE 135 – Spring 2005 Presentation 10"— Presentation transcript:

1 Project GabE ECE 135 – Spring 2005 Presentation 10
Patrick Crosby Omar Al-Jadda Adam Durity Rahmin Sarabi

2 Progress Report Tested and verified functioning Rx
Tested and verified functioning Tx Updated our board design Ordered additional parts Ordered and received second board

3 Gantt Chart

4 Rx Testing Test with input from pattern generator
Very good eye pattern 40dB Attenuation 70dB Attenuation

5 Tx Testing - Conservative
0dB/205ohm 0dB/515ohm

6 Tx Testing - Aggressive
0dB/810ohm

7 GabE Board Design 2.0

8 GabE Board Design 2.0 Fixed power connector
Changed orientation of VCSEL Gave the ground plane around the Tx chip more space Aggressive design strives to achieve LC spacing but violates many design rules

9 Financial Budget

10 Upcoming Week Build GabE Board Design 2.0
Begin extensive testing of new design Loopback tests Attenuation