SPS 1 and 5 during W2-3 2019 J.MEIGNAN EN-ACE-OSS 09/01/2019.

Similar presentations


Presentation on theme: "SPS 1 and 5 during W2-3 2019 J.MEIGNAN EN-ACE-OSS 09/01/2019."— Presentation transcript:

1 SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019

2 Activities ongoing week 2
Point 1 ABT works in BA1 Point 5: No works possible in BB5/ECA5 during the removal of the shielding 09/01/2019 J.MEIGNAN

3 Activities ready to start on week 3
Point 1: Dry riser installation: VIC 14/01 Warning: lift maintenance from 10a.m to 12a.m 09/01/2019 J.MEIGNAN

4 Activities ready to start on week 3
Point 5: Survey: start on Friday this week Beam line dismantling Can we anticipate the lockout of your equipment on Friday 11/01? 09/01/2019 J.MEIGNAN

5 Activities ready to start on week 4
Point 5: EN-EL works: decabling / VIC 22/01 09/01/2019 J.MEIGNAN

6 Reminder: rules near BA5
To avoid problems seen during other YETS/EYETS with neighbours Road to use Pedestrian roads Parking outside point 5 : forbidden 09/01/2019 J.MEIGNAN

7 Any questions?