Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jefferson Lab Users Group Meeting Start of the 12 GeV Era

Similar presentations


Presentation on theme: "Jefferson Lab Users Group Meeting Start of the 12 GeV Era"— Presentation transcript:

1 Jefferson Lab Users Group Meeting Start of the 12 GeV Era
John Arrington (JLab Users Group Chair) Argonne National Laboratory JLab Users Group Meeting, June 2-4, 2014

2 Users Group Board of Directors
May 2014 Election: Vice-chair Haiyan Gao At-large members Elton Smith Silvia Niccolai Garth Huber Postdoc Rep. Elena Long Grad Student Rep. Melissa Cummings Nominating committee: D. Day, N. Walford, R. Holt, I. Niculescu, K. Slifer, V. Crede UGM organization: Katherine (Myers) Mesick Lorelei Chopard Steffen Strauch Dipangkar Dutta JA

3 Program Notes Tomorrow (Tuesday, June 3): The morning coffee break will be shortened by 10 minutes for Presentation by Jerry Draayer and JSA Award Presentations (Postdoc Prize, Thesis Prize) Talks are being livecast on the web; links to the video feed are on the main meeting page: We are proposing a change to the Users Group Charter to move to a four-person chair line (Chair Elect, Vice Chair, Chair, Past Chair): Details will be presented at the business meeting tomorrow (5pm) Lunch times coordinates with HUGS (for student lunch seminars), so we’ll need to keep on schedule

4 12 GeV Project Highlights
Hall D & Counting House Hall D Arc Magnets 12 GeV Cryomodules Hall B Drift Chamber Hall D Central Drift Chamber Hall C

5 Accelerator Commissioning Progress
2214 MeV 34 MeV 2R 0R E0 ~ 6.1 GeV PHMS ~ 2-3 GeV 1124 MeV CHL1, CHL2 operational Linacs at 2K North Linac – 1090 MeV South LINAC – 1090 MeV CEBAF GeV Optics, Magnets great 1R 2S KPP: machine capable of 12 GeV 1 pass at 2.2 GeV/pass for 8 hours with acceptable trip rate (50% uptime)

6 2014 Progress so far… and beyond??
24 22 20 18 16 14 12 2014 Progress so far… and beyond?? 12 10 8 6 4 2 R&D Magazine: “Scientists unleash highest-energy beam ever at Jefferson Lab” …and we’re not done yet! Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Today Feb 5: 2.2 GeV (1 pass) to BSY! Apr 1: 6.1 GeV to Hall A!! May 7: 10.5 GeV to Hall D!!!


Download ppt "Jefferson Lab Users Group Meeting Start of the 12 GeV Era"

Similar presentations


Ads by Google