Stefan Leedham Transmission Workstream 2nd November 2006

Similar presentations


Presentation on theme: "Stefan Leedham Transmission Workstream 2nd November 2006"— Presentation transcript:

1

2 Stefan Leedham Transmission Workstream 2nd November 2006
UNC MOD PROPOSAL 0121: The Provision of Ex-Post Demand Information for all NTS Offtakes Stefan Leedham Transmission Workstream 2nd November 2006

3 INTRODUCTION Information currently available
Information that would be released Exit points impacted Timing of Publication Interaction with Modification Proposal 0116 Other Issues

4 INFORMATION CURRENTLY AVAILABLE
Report Timing Entry Point Sub-Terminal Terminal Aggregate N/S National Supply Side Energy Flow Data Real Time NSTAFF H+1 NTSAPF NTSEOD D+1 Demand Side SISR03 D-1 NB92 SISR04

5 INFORMATION THAT WOULD BE RELEASED
Total Physical Flows for the previous gas day Published at D PM For all Exit Points from the NTS Individual LDZ offtake from the NTS Individual NTS connected storage site Individual NTS connected power station Individual NTS connected interconnectors Individual NTS connected industrial load Total Shrinkage Volumes for the NTS for the previous gas day, disaggregated into Own Use Gas and Unaccounted for Gas Published on National Grid’s public website

6 EXIT POINTS IMPACTED 122 LDZ offtakes from the NTS
38 Power Stations (33 according to National Grid) 17 Industrial Sites 10 Storage sites (9 according to National Grid) 2 Interconnectors

7 TIMING OF PUBLICATION Data to be published after the gas day at 12.00PM Data to be updated up to D+5 as additional information becomes available No requirement to publish data if it is not available to National Grid

8 INTERACTION WITH EXIT REFORM PROPOSAL
Mod 121 would release total physical offtake from the NTS by exit point at D PM stage – not flows up to In Business Rules accompanying Mod 116 National Grid publish information: By NTS Exit Point on volume of flat capacity allocated: 24 hours after long term prevailing allocation, 24 hours after completion of medium term auction 1 hour after completion of day ahead firm auction 1 hour after completion of day ahead interruptible auction By NTS Exit zone the volume of flexibility capacity allocated.

9 OTHER ISSUES Data ownership
TPD Section V 5.8 TPD Section M (b) Requirements to make information available to National Grid TPD Section M 4.2.1, 4.5 & 5.2 Commercially Confidential Information Need for aggregation?

10 THANK YOU