Download presentation
Presentation is loading. Please wait.
1
Coppice Ridge, Fiskerton, Newark
Works/services provided: Site levelling, in-situ raft foundations and sub-structure Masonry superstructure, structural steelwork, traditional timber roof and clay pan tiles Swimming pool construction – tanking, mechanical inst, tiling and commissioning Stud partitions, full M&E services, plaster finishes, flooring and decoration throughout Value of contract: Length of contract: Contract start date: Completion date: £500,000 12 months July 2014 June 2015 Detailed description of contract: A single storey extension to provide a hydrotherapy pool, plant room, passenger lift and carers accommodation. Extensive alterations and re-modelling of the existing residence to provide specialist facilities and access for a physically disabled young person. The form of contract is a JCT 2011 Intermediate Building Contract (IC). Particular challenges to be overcome: Contact details: Critical Path phasing and temporary works to enable the family to remain in residence for the duration of the project Co-ordination of specialist suppliers and installers to ensure the correct infrastructure to support; hydrotherapy pool plant, automated access controls, hoists, H&V, lighting with integrated wireless controllers Francis Sedgman Sedgman Noble Architects Unit 5 Spring Meadows Bus. Ctr. Highfield Farm, Wargrave Reading. RG10 8PZ Tel:
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.