Final Detailed Design Review
P16420: Lip Balm and Hand Salve Production Process Improvement
2
Team Members Jason
3
Agenda -Final Design -Heating Element -Nozzle Clamp
-Pouring Trays (Proof of Concept) -Bill Of Materials -Risk Management -Questions Jason
4
Testing Heating Element
6 Tests -Water Test -Oil Test -Modified Oil Test -Oil-Beeswax Test (low temp) -2nd Oil-Beeswax Test (high temp) -Empty Test Ben
5
Test Plans -Time to heat product -Time to dispense and cool
-Time to Clean -Weight of system -Highest temperature students are exposed to Ben
6
Test Plan Results -Time to heat product : 10 minutes
-Time to dispense and cool: - 2-3 seconds to dispense - 15 minutes to cool -Time to Clean: Boiling Water- 8 minutes -Weight of system: TBD -Highest temperature boiler exterior reaches: 119°F Alex
7
Heating Element Test Results
Boiler handles water as instructions specify Boiler initially did not work as hoped with oil, was heating up too fast Modified boiler to allow proper oil heating Boiler heater heats oil to 200°F when set to 185°F Dispensing system tested while product is hot Did not clog after dispensing Checked every minute until 15 minutes after dispensing Jason Alex Ben
8
Solenoid-Nozzle Connector
Jin - 12N and 30mm
9
Pouring Trays Mike
10
Pouring Tray Prototypes: Tins
Mike
11
Tray Testing Results Pouring Tray prototypes (tins):
2 3-D printed models, 1 CNC’d model PLA (3-D printed) material deforms (as expected) after several consecutive pours White Plastic (CNC’d) material does not deform, results are consistent So far, within 2% of desired product weights Pouring Tray prototype (tubes): 1 CNC’d model, made of White Plastic Material has to be milled with proper tolerances Mike
12
Trial 1 Results Alex
13
Pouring Tray Prototypes: Tube
Ben
14
Bill Of Materials Mike
15
Risk Management Jason
16
Final System Autumn
17
Next Steps Test a larger lip balm pouring tray
Analyze if additional ventilation is required Vents in plexiglass Gather leftover material from MSD II teams Further test pouring trays for tins Jason