Download presentation
Presentation is loading. Please wait.
Published byJulissa Over Modified over 10 years ago
1
The Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STRATEGIC INFRASTRUCTURE POLICIES AND PROGRAMS 1 Secretary ROGELIO L. SINGSON Iloilo Business Forum Grand Ballroom, Intercontinental, Manila 12 March 2014
2
Condition of Philippine Road Network: Based on 2013 Road Condition Data 300,000 sq. kmTotal Land Area 215,717 kmsTotal Overall Road Network 32,227 kmsTotal National Road Length 0.72 km/sq. kmRoad Density 0.20 km/sq. kmPaved Road Density 0.27Overall Paved Road Ratio 0.83Paved Road Ratio for Natl. Roads 2
3
DPWH Strategic Policies and Programs: 3 Good Governance and Anti-Corruption Program Better Quality and Safer National Roads and Bridges Program Effective Flood Control Program Strategic Convergence Program Public-Private Partnership Program Resiliency Program
4
The Global Competitiveness Report: Quality of Roads by World Economic Forum 4 Ranking of the Philippines significantly improved from no. 114 (2010-2011) to no. 87 (2013-2014) Legend: 1 = extremely underdeveloped; 7 = extensive and efficient by international standards (Based on 148 Countries) 5.7 5.4 5.1 5 5 4.9 3.5 3.4 3.7 2.7 2.6 2.7 3.1 2.8 3.1 3.4 3.6
5
Condition of Region VI Road Network: Based on 2013 Road Condition Data 5 ILOILO CAPIZ AKLAN ANTIQUE GUIMARAS NEGROS OCCIDENTAL
6
Average IRI by Region: 6
7
Distribution of FY 2014 Budget by Region: (Based on GAA-Capital Outlays, Projects) 7 CAR – P 6.87 B Region I – P 6.36 B Region II – P 6.67 B Region III – P 11.94 B NORTHERN LUZON-P31.84 B (21.1%) Region XIII – P 5.77 B Region X – P 11.02 B Region IX – P 7.34 B Region XI – P 7.89 B Region XII – P 5.55 B MINDANAO – P37.58 B (24.9%) NCR – P 23.78 B (15.7%) Region IV-A – P 12.60 B Region IV-B – P 8.03 B Region V – P 9.92 B SOUTHERN LUZON-P30.56 B (20.2%) Region VI – P 12.60 B Region VII – P 7.91 B VISAYAS – P27.42 B (18.1%) Region VIII – P 6.91 B TOTAL : P151.17 B * Excluding Inter-Regional/Nationwide-P39.76 B
8
2011-2014 Region VI Infrastructure Investment : Amount in Billion Pesos 8
9
Major Projects in Iloilo 9 Completed Projects: 1.Metro Iloilo Radial Road 2.Iloilo River Esplanade 3.Widening of Iloilo-Capiz Road (Jaro-Leganes-Zarraga Sect. 4.Iloilo Flood Control On-going Projects: 1.Iloilo Circumferential Road 2.Widening / Improvement of Iloilo-Jaro Diversion Road to Iloilo Airport 3.Const. of Iloilo Convention Center 4.Widening of all roads leading to Iloilo Business Park 5.Construction of Drilon Bridge 6.Widening / Improvement of Gen. Luna Sect.
10
The Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THANK YOU !!! 10
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.