Download presentation
Presentation is loading. Please wait.
Published byElisabeth Ellis Modified over 5 years ago
1
Draft guidelines ‘Congestion Management’ EURELECTRIC’s position
ERGEG public hearing 30 June 2005
2
GENERAL PRINCIPLES FOR CONGESTION MANAGEMENT
EURELECTRIC fully in line with CBT Regulation & current guidelines for congestion management. Urgent to have market-based allocation mechanisms on all interconnectors! i.e.: explicit/ implicit auctions. Also key: maximise available capacity (compatible with security concerns) and capacity use.
3
ABOUT THE DRAFT GUIDELINES
Well structured – principles first, then concrete provisions. Exact role of agents needs to be further clarified. Undue restrictions to trade likely to translate into inefficiencies.
4
EURELECTRIC COMMENTS Roles & responsibilities for capacity allocation:
TSOs Regulators Fines Restrictions in capacity allocation Transparency
5
ROLES & RESPONSIBILITIES
Involve both Regulators & TSOs in the harmonisation of allocation procedures. TSOs shall not necessarily intervene in the re-assignment of unused capacity (though they should be keept them informed).
6
FINES & RESTRICTIONS TO CAPACITY ALLOCATION
Fines for not using the allocated capacity should be proportionate to the financial consequences. Restrictions to capacity allocation always mean a loss in efficiency (less revenues). They should thus only be permitted in case of proven abuse of dominant position.
7
TRANSPARENCY TSOs need information from different market participants to guarantee system security. Information required by Regulators on available generation & consumption must be published by TSOs in a non-discriminatory way. Publication under Regulators’ control.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.