Download presentation
Presentation is loading. Please wait.
Published byΓιάννη Μπότσαρης Modified over 5 years ago
1
Grand Opening April 15, 2013 Prepared by: Karen McKay
Sports Connection Grand Opening April 15, 2013 Prepared by: Karen McKay
2
Facilities Upgrades Building renovations General park upgrades
Playing fields upgrade Swimming pool and tennis courts upgrades Driving rang/putting green construction Equipment and furniture
3
Sports Connection Complex
4
Schedule of Events TV interview 5 a.m. Aerobics feature 8 a.m. Tours 9:00 – 10:45 a.m. Dignitaries’ reception 9:30 – 10:30 a.m. Opening ceremony 11:00 – 11:45 a.m. Picnic 12 noon Soccer tournament 2:30 p.m.
6
Printing Invitations $3,500 Newsletter $4,000 Program $2,000
7
Mailings Paper $1,000 Postage $1,500
8
Advertisement Newspaper ads $150 Tee Shirts with logos $2,200
9
Decorations Banners $375 Balloons $75 Tablecloths $200
10
Picnic Food $10,000 Soft drinks and cups $2,000
11
Speaker Speaker’s fee $5,000 Travel $800 Hotel and meals $200
12
Entertainment Entertainment $7,000
13
Grand Opening Ceremony
Ribbon cutting by Mayor Skipwith Speaker Light refreshments
14
Location: Main lobby at 5 a.m. Air time: 6 a.m., 6 p.m. and 10 p.m.
Television Interview Location: Main lobby at 5 a.m. Air time: 6 a.m., 6 p.m. and 10 p.m. Interviewees: Wallace Brooks L. N. Skipwith Karen McKay
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.