1 CRYOMODULE FINAL ASSEMBLY
SNS PPU CRYOMODULE PDR CRYOMODULE FINAL ASSEMBLY Jim Henry Wednesday, February 27, 2019

2 OUTLINE THIS DISCUSSION WILL ADDRESS THE FINAL CRYOMODULE ASSEMBLY
THE SPACEFRAME \ THERMAL SHIELD ASSEMBLY HAS BEEN INSTALLED, ALIGNED, AND LOCKED DOWN. THE END CANS HAVE BEEN FINAL ALIGNED AND INSTALLED. DESIGN REQUIREMENTS ARE THE SAME AS STATED FOR SIMILAR COMPONENTS

3 SUPPLY END FINAL ASSEMBLY STEP 1
BEAMLINE THERMAL INTERCEPT

4 SUPPLY END FINAL ASSEMBLY STEP 2
FLANGE \ COUPLER VALVE PRIMARY JT VALVE PRIMARY LHe SUPPLY SHIELD SUPPLY HP He FROM H/X HP He TO H/X

5 SUPPLY END FINAL ASSEMBLY STEP 3
THERMAL SHIELD EXTENSION

6 SUPPLY END FINAL ASSEMBLY STEP 4
OUTER MAGNETIC SHIELD EXTENSION

7 SUPPLY END FINAL ASSEMBLY STEP 5

8 SUPPLY BEAMPIPE INSTALLATION
BEAMPIPE THERMAL INTERCEPT INSTALLED BELLOWS BRACE REMOVED THRU VACUUM TANK PORT O-RING SEAL BEAMPIPE TO VACUUM TANK END PLATE CF SEAL BEAMPIPE TO PUMP DROP

9 RETURN END FINAL ASSEMBLY STEP 1
BEAMLINE FLANGE THERMAL INTERCEPT

10 RETURN END FINAL ASSEMBLY STEP 2
PRIMARY 2K RETURN SURGE TANK HP He FROM H/X HP He TO H/X SHIELD RETURN

11 RETURN END FINAL ASSEMBLY STEP 3
THERMAL SHIELD EXTENSION

12 RETURN END FINAL ASSEMBLY STEP 4
OUTER MAGNETIC SHIELD EXTENSION

13 RETURN END FINAL ASSEMBLY STEP 5

14 RETURN BEAMPIPE INSTALLATION
BEAMLINE THRERMAL INTERCEPT INSTALLED BELLOWS BRACE REMOVED THRU VACUUM TANK PORT O-RING SEAL BEAMPIPE TO VACUUM TANK END PLATE CF SEAL BEAMPIPE TO GATE VALVE

15 EXTERIOR ASSEMBLY INSTRUMENTATION PORTS INSULATING VACUUM GAGES
ASME BURST DISC INSULATING VACUUM VALVE COUPLER OUTER CONDUCTOR COOLING RETURN PARALLEL PLATE VACUUM RELIEF (x2)

16 REMAINING TASKS ADJUST BEAMLINE THERMAL INTERCEPT TO SUIT AVAILABLE CLEARANCE DETAIL PIPING ASSEMBLIES FINALIZE SHEET METAL DESIGNS (THERMAL AND MAGNETIC) FINALIZE BEAMPIPE TO VACUUM TANK INTERFACES CHECK PRESSURE, FLEXIBILITY, AND SHIPPING DESIGNS CREATE DESIGN DRAWINGS CREATE SOW’S AS NEEDED