Presentation is loading. Please wait.

Presentation is loading. Please wait.

TRACES DWH Friday 5 may 2011 DWH Architecture overiew

Similar presentations


Presentation on theme: "TRACES DWH Friday 5 may 2011 DWH Architecture overiew"— Presentation transcript:

1 TRACES DWH Friday 5 may 2011 DWH Architecture overiew
Production environment Main workflows between DBs DWH main workflows Certificates workflows SANCO A4, sanco bi team

2 BODI Designer + Admin console
TRACES DWH Architecture DG Sanco Bruxelles BODI Designer + Admin console Terminal Server Outside world Webi Server 6.5.1 Web client httpS BO repository server DB server Oracle 10 oratraces.cc.cec.eu.int TRACES DWH DB server Oracle 10 DIGIT Luxembourg TRACES Production Database servers Oracle 10 Data Integrator job server BODI XI 11.7 SANCO A4, sanco bi team

3 TRACES DWH Production Environment TRACES DW Reporting DWH ARCHIVE DWH
BO DI DWH (Statistical Database) (all TRACES data +changes history) 69 GB TRACES DW Reporting Production Environment DWH JOB_TDWH TRACES (Transactional data) TRACES_D BO universe (Snapshots) WF_DWH WF_ODS ODS (all TRACES data +changes history) 92 GB Statistical Reports 7h40’ 2h00’ WF_BO_USERS BOTDWHP repository 4’ WF_ARC ARCHIVE REFERENCE ODS /DWH INTRA : CVEDA : CVEDP : IMPORT : Archive (last status) 60 GB Ad-hoc Queryig On Archive Data TAR_xxx BO universes 40’ Job’s starting Job’s ending 0h15’ Reading from TRACES 2h15’ 2h55’ 9h56’ 10h’ SANCO A4, sanco bi team

4 TRACES DWH DWH main workflows JOB_TDWH WF_DWH TRCDWHLP ODS
BO DI JOB_TDWH WF_DWH DWH main workflows TRCDWHLP TRCDWHLP WF_FACTS_INTRA ODS 5h50’ WF_DIMENSIONS WF_FACTS_CVEDA 1h46’ 1h20’ WF_FACTS_IMPORT 45’ WF_FACTS_CVEDP 5h20’ Workflow’s starting Workflow’s ending 2h15’ 4h51’ 5h11’ 9h11’ 9h56’ SANCO A4, sanco bi team


Download ppt "TRACES DWH Friday 5 may 2011 DWH Architecture overiew"

Similar presentations


Ads by Google