Health Sector
2
Update Overall current status – 42.99% Completed 38 Under Construction
Total to be Reconstructed 307 Target for /307 (100%) Stage Previous Present Progress % Completed 38 Under Construction 80 94 17.5 Planning Stage 189 175 8 Total 307 Prefab Facilities 137 Overall current status – 42.99%
3
Construction Status - District Wise
Prefab Planning Construction Stage Completed Total Est. Budget* D&S GoP Mansehra 27 29 20 9 5 43 2600 Battagram 17 14 2 12 21 35 1215 Shangla 3 16 1 15 23 1165 Kohistan 22 640 Abbottabad 19 24 1110 Muzaffarabad 41 31 11 61 2910 Neelum 13 730 Poonch 6 37 1510 Bagh 26 25 46 2080 137 175 62 113* 94 38 307 13960 %age 57% 35.42 64.57 30.61 12.37 *Rs. in Million