NDIA PMSC Baseline Stability Working Group
January 2009
2
Baseline Stability Gerald Self - ITT Marty Doucethe – EVM Services
Sondra Ewing – Lockheed Martin Tom Tasker – General Atomics Fran Fulton – Northrop Grumman Neil Albert - MCR Pete Wynne – Lockheed Martin Joe Houser – KM Systems Linda Nobel – Raytheon Mary Ann Hale – General Dynamics Walt Berkey – Lockheed Martin Gary Robinson - Raytheon Ed Silvia - Raytheon
3
Objective Goals Baseline Stability
Adapt the Program Performance Management Construct to Integrate into the Acquisition Process. Goals Eliminate Waste and Reduce Re-Work Streamline the Process Steps Minimize Deconstruction Integrate With Existing Processes
4
Baseline Stability Deliverables Baseline Stability Definition
Guideline Adaptability Assessment Process Gap Analysis