MVB-II Assembly Instructions
© All Rights Reserved to Mifram Ltd. 2018
3
About the MVB-II The MVB 2 is an advanced and improved version of the original Mifram MVB The overall principle remains the same When assembled units vertical element is impacted diverting the horizontal momentum into the ground The placement of the MVB is crucial. The Pictures demonstrate the correct orientation of the units The open side of the L shaped unit is the side to face the threat and receive the impact Tested & Approved:
4
Deployment Recommendations
If Possible, deploy the MVB-II where the ramming car will be situated in the lower speed by using natural obstacles like curves etc. Block road sides and side walks. Use warning lights and signs.
5
Orientation of Elements in direction of potential threat
(Open L shape) in direction of potential threat Direction of Potential Threat MVB – II Deployment
6
Safety Warning Be aware that several parts are heavy (26 kg) and sharp, pay attention during unloading, assembling and packing Elements Placed upright prior to being joined can fall on their side and create a hazard
7
The complete MVB-II
8
MVB-II Parts
9
R Pin
10
Handle
11
Rod & End Unit
12
Pull out the safety R pin
13
Pull out the safety R pin
14
Pull out the locking yellow pin
15
Pull out the locking yellow pin
16
Lift the upper part
17
Lift the upper part and Insert the locking yellow pin
18
Insert the locking yellow pin into the right hole
The wrong hole The right hole
19
Insert the locking yellow pin into the right hole
The wrong hole
20
Insert the safety R pin
21
Insert the safety R pin
22
Safety pin placed in the locking pin
23
Assembling of the units one after the other
Repeat the above steps as needed in order to get required barrier width
24
Start on left side, insert rod
25
Insert the Rod B’H
26
Insert the Rod to the next unit
27
Add the second rod
28
Commence second section Insert second wheel section
29
Insert large safety pin
30
Insert large safety pin and lock it with the spring
31
Assembled and secured rods
32
Assembled 2 units with rods
Repeat the above steps as needed in order to get required barrier width
33
MVB-II Assembling First Meter
Exercise Care Units when opened and in standing position can tip and fall sideways. In order to prevent this, keep all units laying on their side on the ground surface until you are ready to join them.
34
Repeat the above steps
35
Assembling of the last right side unit
36
Assembling of the last right side unit
37
The End Unit
38
Insert the End Unit
39
Insert large safety pin and lock it with the spring
40
Assembled units without handle
Place of handle
41
Attach the handle
42
Secure the handle with safety pin and lock it
43
MVB-II with rods & handle
44
Next step Assembling of the upper and lower cross section bars
45
Pull out the safety R pin from the upper cross section bar
46
Pull out the yellow pin and lift the upper cross section bar
47
Insert the yellow pin, Always from the front side
48
Secure with the R pin from the back side
49
Pull out the safety pins from the lower cross section bar
50
Move it to the right position
51
Secure the lower cross section bar with the safety and the R pin
52
Insert the R pin
53
MVB-II is ready for operation
54
Please contact us Thank you for purchasing Mifram MVB-II.
with any question or information you may have. Our customer support will be happy to help you. © All Rights Reserved to Mifram Ltd. 2018