Necessity for Reviewing (1) -- Circumstances Surrounding the TTC --
- The ITU-T-oriented committee configuration of the TCC does not match the recent external situations. - The TTC has started to work mainly on the IP technology and in more diverse fields. - The TTC should reinforce its organization for cooperating with outside organizations (such as the GSC). TTA-ARIB/TTC-CCSA Meeting June 2002
3
Necessity for Reviewing (2) -- Inside the TTC --
- Increasing number of instances in which, in addition to a two-level structure of Technical Committees and Working Groups, an SWG is set up to carry out standardization (resulting in three-level hierarchy). TTA-ARIB/TTC-CCSA Meeting June 2002
4
TTA-ARIB/TTC-CCSA Meeting June 2002
Approach to Reviewing - Extensively review the way Technical Committees and other groups are organized. - Organize Technical Committees and other groups in such a way that they can swiftly catch up with changing times. -- Top-down functions -- Simple hierarchical structures - Allow for committee activities linked with those of the GSC, NGN, and others. TTA-ARIB/TTC-CCSA Meeting June 2002
5
Present Committee Configuration
Strategic Research and Planning Committee Present Committee Configuration Technical Committee 1 (Network-Network Interface) Technical Committee (User-Network Interface) Technical Assembly (TA) Technical Committee 3 (PBX, LAN) Coordination Committee Technical Committee (High Layer Protocol) Technical Committee 5 (Multimedia Service Systems and Coding Scheme) Technical Committee (Mobile Communications) TTA-ARIB/TTC-CCSA Meeting June 2002
6
Rough Plan Overview (Overall Image for Future)
Technical Assembly (TA) Working Groups Allocate a manager (tentative name) to administrate each Working Group TB - Administrate the activities of Working Group. - Plot out mid- and long-term strategies for standardization. - Select new standardization theme. - Abolish or merge Working Groups. - Take up the functions of the Coordination Committee. TTA-ARIB/TTC-CCSA Meeting June 2002
7
Rough Plan for New Committee Configuration
- Abolish Technical Committees and centrally place Working Groups for standardization activities. - Categorize Working Groups, allocate a manager for each category for administrating the activities of the Working Groups in the category. Network division, information and communications division, and mobile division TTA-ARIB/TTC-CCSA Meeting June 2002
8
TTA-ARIB/TTC-CCSA Meeting June 2002
New Working Groups - Reconstruct groups for new activity fields. - Abolish or merge the existing Working Groups according to the situations of their activities. - Organize the groups such that they allow for linkage with the NGN. TTA-ARIB/TTC-CCSA Meeting June 2002
9
Technical Board (tentative name) (1)
- Set up the Technical Board as a core organization for handling the TTC’s strategies for standardization. - Configure the Technical Board with the chairman and vice-chairman of the Technical Assembly, manager (tentative name), and secretariat. - Allocate the manager (tentative name) as a promoter for standardization in a specific field (category) and put Working Groups in charge of the manager. TTA-ARIB/TTC-CCSA Meeting June 2002
10
Technical Board(tentative name) (2)
- Abolish the Coordination Committee, and have the TB take up its functions (such as deliberating draft standards to be brought up to the Technical Assembly). TTA-ARIB/TTC-CCSA Meeting June 2002
11
Schedule for Future Reform
First half of fiscal 2002 Second half of fiscal 2002 Fiscal 2003 <1> Abolishing or merging Working Groups Technical Assembly <2> Reviewing the rules and procedures Technical Assembly Finalizing reform plan Establish the TB, and abolish the Technical Committees and Coordination Committee. TTA-ARIB/TTC-CCSA Meeting June 2002