Download presentation
Presentation is loading. Please wait.
Published byἈπφία Λειβαδάς Modified over 5 years ago
1
March 2009 Closing Report Date: 2009-03-12 Authors: March 2009
Month Year doc.: IEEE yy/xxxxr0 March 2009 March 2009 Closing Report Date: Authors: Dorothy Stanley (Aruba Networks) John Doe, Some Company
2
Abstract This document contains the TGv closing report for March 2009.
Month Year doc.: IEEE yy/xxxxr0 March 2009 Abstract This document contains the TGv closing report for March 2009. Dorothy Stanley (Aruba Networks) John Doe, Some Company
3
Goals and Accomplishments
Month Year doc.: IEEE yy/xxxxr0 March 2009 Goals and Accomplishments Comment resolution from LB 140 Completed resolution of LB 140 comments Letter Ballot Acknowledgements Thanks to David Goodall, for serving as secretary Dorothy Stanley (Aruba Networks) John Doe, Some Company
4
Comment Processing Summary
Month Year doc.: IEEE yy/xxxxr0 March 2009 Comment Processing Summary Total 586 Technical 418 Editorial 168 Editor Done/To Do 306/280 Comment resolutions adopted to date Comments remaining Dorothy Stanley (Aruba Networks) John Doe, Some Company
5
Documents for 08/1467 comment resolution
Month Year doc.: IEEE yy/xxxxr0 March 2009 Documents for 08/1467 comment resolution Category Volunteers Document Annex S. McCann Collocated Interference Jari Jokela, Jing Zhu Diagnostics D. Stanley Event Joe Kwak FMS A. Thomson General , 0019 Multicast Diagnostics Alex Ashley , 0135 Location/Timing A. Thomson/Ganesh , 0133 Proxy ARP Roaming Management Emily Qi SleepMode STA Statistics Y. Seok, G. Venkatsan , 0131 TFS TIM Broadcast M. Wentink Traffic Generation Moo-Ryong Jeong Virtual AP Qi Wang TCLAS G. Venkatsan Channel Usage E. Qi Directed Multicast Resolutions # CID # remaining 1/13, 1/6 5 1/13, LA 16 LA 19 51 28 42 14 55/72 4 13 8 1/6 6 27 1 3 20 Dorothy Stanley (Aruba Networks) John Doe, Some Company
6
Output Documents 11-09-0399-00-000v-TGv-March-2009-closing-report.ppt
Month Year doc.: IEEE yy/xxxxr0 March 2009 Output Documents v-TGv-March-2009-closing-report.ppt v-March-2009-agenda.ppt v-March 2009 meeting notes Dorothy Stanley (Aruba Networks) John Doe, Some Company
7
Month Year doc.: IEEE yy/xxxxr0 March 2009 Motion Having approved comment resolutions for all of the comments received from LB140 on TGv Draft 4.0, instruct the editor to prepare Draft 5.0 incorporating these resolutions and Approve a 15 day Working Group Recirculation Ballot asking the question “Should TGv Draft 5.0 be forwarded to Sponsor Ballot?” Mover: Allan Thomson Seconder: Qi Wang Result: 5-0-0 Dorothy Stanley (Aruba Networks) John Doe, Some Company
8
TGv Timeline – Updated Sept, 2008
Month Year doc.: IEEE yy/xxxxr0 March 2009 TGv Timeline – Updated Sept, 2008 Initial Working Group Letter Ballot: July 07 – completed Jan 08 – D2.0, May 08 – D3.0 Re-circulation Working Group Letter Ballot: November 08 (D4.0) Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) Form Sponsor Ballot Pool: June 09 Initial Sponsor Ballot: Sept 09 Sept 09 – D7.0 Approved Sponsor Ballot: Nov 09 Nov 09 – D8.0, Jan 09 - D9.0, Feb D10.0, March D11.0 May 12th ( or so) for Revcom June Approval Final WG/EC Approval: July 2010 RevCom/Standards Board Approval: June 4th/June 5th(or so) Note: TGv PAR is authorized through Dec 2010 Dorothy Stanley (Aruba Networks) John Doe, Some Company
9
Goals for May 2009 Comment resolution Recirculation Letter Ballot
Month Year doc.: IEEE yy/xxxxr0 March 2009 Goals for May 2009 Comment resolution Recirculation Letter Ballot Dorothy Stanley (Aruba Networks) John Doe, Some Company
10
References March 2009 Month Year doc.: IEEE 802.11-yy/xxxxr0
Dorothy Stanley (Aruba Networks) John Doe, Some Company
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.