Download presentation
Presentation is loading. Please wait.
Published byVladimír Tábor Modified over 5 years ago
1
Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [WG-TG3 closing Report Jan02] Date Submitted: [24Jan02] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[ ], FAX: [ ], Re: [02005r2P802-15_TG3-Jan02-Meeting-Objective-and-Agenda.xls] Abstract: [TG3 Chair Report to WG] Purpose: [TG3 chair report to WG to update them on work completed in Dallas.] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by January 2002 doc.: IEEE /005r0 January 2002 John Barr, Motorola John Barr, Motorola
2
IEEE 802.15 Working Group for Wireless Personal Area Networks
January 2002 doc.: IEEE /005r0 January 2002 802.15 IEEE Working Group for Wireless Personal Area Networks TG3 Closing Report January 2002, Dallas, TX USA John Barr, Motorola John Barr, Motorola
3
Agenda Goals of January Meeting Major Accomplishments
doc.: IEEE /005r0 January 2002 Agenda Goals of January Meeting Major Accomplishments Goals for March Meeting John Barr, Motorola John Barr, Motorola
4
Goals of the January Meeting
doc.: IEEE /005r0 January 2002 Goals of the January Meeting Conference call status, including approval of any ad hoc business Letter Ballot Comment Resolution Initiate Sponsor Ballot Or Comment Resolution and Re-Circulate Update Draft as Required to D10 Call for Patents Plan Party John Barr, Motorola John Barr, Motorola
5
Major Accomplishments
January 2002 Major Accomplishments Addressed LB12 Comments 1851 Total 554 TRs 334 TRs Remaining to be addressed (12 voters) Coexistence Presentation to 802 COEX BoF 02/041r2 TG3-Coexistence-Capabilities.ppt John Barr, Motorola
6
January 2002 No Voter Status John Barr, Motorola
7
LB12 Status 40-day LB12 Results Dallas Comment Resolution
January 2002 LB12 Status 40-day LB12 Results 49 Yes, 22 No 69% Approval Dallas Comment Resolution 56 Yes, 15 No 79% Approval Ballot Passes, Recirculation will occur following final comment resolution. John Barr, Motorola
8
January 2002 Goals for March Conference call status, including approval of any ad hoc business. Letter Ballot Comment resolution Default Cipher Suite Selection Ballot Recirculation ExCom Sponsor Ballot Prep (Letter Ballot) Update Draft as Required (D10 or D11) Call for Patents John Barr, Motorola
9
Next Steps Bi-Weekly Conference Calls
January 2002 doc.: IEEE /005r0 January 2002 Next Steps Bi-Weekly Conference Calls 10AM C(hair)ST Tuesday 11AM CST Thursday Ad Hoc Final Comment Resolution Meeting February (Monday-Wednesday) – Schaumburg 9AM Monday to 3PM Wednesday Update draft for recirculation Recommended 20-day recirculation ballot Update draft for sponsor ballot John Barr, Motorola John Barr, Motorola
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.