Presentation is loading. Please wait.

Presentation is loading. Please wait.

IHO NCWG2 IHB, Monaco April 2016

Similar presentations


Presentation on theme: "IHO NCWG2 IHB, Monaco April 2016"— Presentation transcript:

1 IHO NCWG2 IHB, Monaco 26-29 April 2016
Abbreviation or Full Word for Conspicuous Features

2 An Inconsistency? B-340.3: B-122:

3 An Inconsistency? (2) B-373.2: B-374.2:

4 An Inconsistency? (3) B-540.1:

5 Recommendation: Australia recommends that one of the following options is applied to S-4: Remove the statement “Abbreviations should only be used if space is limited.” from S-4 – B 2. Amend the statement at B to read similar to: Abbreviations should be used as appropriate (see B-122.1), however the full word may be used to add additional emphasis to the feature if considered necessary. NOTE: Changes will also be required to the water tower example in the graphic at B-340.3, and similarly at INT1 – E2.

6 Action Required of NCWG:
Discuss the paper. Approve one of the changes to S-4 as included in the Recommendations above, and apply consequential change to INT1.

7 Outcomes from HSSC6 affecting the CSPCWG/NCWG: Action HSSC6/25:
NIPWG to stand up a project team to develop the portrayal of data quality categories in collaboration with S-100WG and NCWG. Further discussions required with NIPWG, S-100WG and possible DQWG?


Download ppt "IHO NCWG2 IHB, Monaco April 2016"

Similar presentations


Ads by Google