Download presentation
Presentation is loading. Please wait.
Published byMax Åkesson Modified over 5 years ago
1
doc.: IEEE 802.21-02/xxxr0 Subir Das sdas at appcomsci dot com
Month 20xx doc.: IEEE /xxxr0 Joint Opening Plenary IEEE Media Independent Handover Services Session #54, January 2013 Vancouver, BC, Canada Subir Das sdas at appcomsci dot com Subir Das, Chair WG XXXX, His Company
2
WG Officers Office Officer Chair Subir Das Vice Chair Anthony Chan
Month 20xx doc.: IEEE /xxxr0 WG Officers Office Officer Chair Subir Das Vice Chair Anthony Chan Secretary Charles E. Perkins Editor David Cypher Liaison Clint Chaplin IETF Liaison Yoshihiro Ohba The WG has 22 voting members as of this meeting Subir Das, Chair WG XXXX, His Company
3
IEEE 802.21 Meeting Server Details
Month 20xx doc.: IEEE /xxxr0 IEEE Meeting Server Details Slide 3 Subir Das, Chair WG XXXX, His Company
4
Session Time and Location
Month 20xx doc.: IEEE /xxxr0 Session Time and Location Monday (Jan 14, 2013) Tuesday (Jan 15, 2013) Wednesday (Jan 16, 2013) Thursday (Jan 17, 2013) AM-1 8:00-10:00a NA 802.21c TG 802.21d TG AM-2 10:30-12:30 PM-1 1:30 – 3:30p WG Opening Plenary OmniRAN (ECSG) OmniRAN (ECSG) PM-2 4:00 – 6:00p 802.21d TG 802.21c TG WG Closing Plenary Eve 6:30 – 10:30p Social Event (7:00- 9:00 pm) Default Location: Lord Byron (4th Level); OmniRAN ECSG: Balmoral (Convention Level) ; Subir Das, Chair WG XXXX, His Company
5
WG Objective IEEE is developing standards to enable handover services and interoperability between heterogeneous networks including both 802 and non-802 networks Subir Das, Chair WG
6
Objectives for the January Meeting
Month 20xx doc.: IEEE /xxxr0 Objectives for the January Meeting Task Group Activities 802.21c: Single Radio Handovers Finalize the comment resolution and prepare fro Letter Ballot re-circulation 802.21d : Multicast Group Management Proposal discussion OmniRAN ECSG Subir Das, Chair WG XXXX, His Company
7
Month 20xx doc.: IEEE /xxxr0 Future Sessions – 2013 Plenary: March, 2013, Caribe Royale, Orlando, FL, USA Co-located with all 802 groups Interim: May 2013, Hilton Waikoloa Village, 2013 Co-located with all 802 wireless groups Plenary: , July 2013, Geneva, Switzerland Interim: , Nanjing Zhong Shan Hotel, September 2013, Nanjing , China Plenary: Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA Subir Das, Chair WG XXXX, His Company
8
Month 20xx doc.: IEEE /xxxr0 Future Sessions – 2014 Interim: January, 2014, Century Plaza, Los Angeles, CA, USA Co-located with all 802 groups Plenary: March, 2014, TBD (Non-American Venue) Interim: May 2014, Hilton Waikoloa Village, HI Co-located with all wireless groups Plenary: , July 2014, Manchester Grand Hyatt, San Diego, CA, USA Interim: , September 2014, TBD (Europe or Asia venue) Co-located with all 802 wireless groups Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA Subir Das, Chair WG XXXX, His Company
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.