Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson

Similar presentations


Presentation on theme: "Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson"— Presentation transcript:

1

2 Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson

3 Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson
$177 million total budget Specialty trade contractors assisting design Enabling first phase under construction Demolition of Institute/Annex in 1st Quarter 2018 Foundations beginning 2nd Quarter 2018

4 New Rehab Hospital Turner Construction
Design Consultant HDR Architecture SBE-A/E Goal % Construction Manager Turner Construction Company SBE-C Protégé Foster Construction of South FL GMP $121,305,314 SBE-C Goal % SBE-G/S Goal % SBE-C Protégé Goal 6.31% David Clark

5 New Rehab Hospital Turner Construction
PROJECT UPDATE Temporary Corridor construction ongoing Demolition of Institute and Annex is ongoing Oil Switch replacement (electrical scope) is in process Design Development documents are complete Complete permit documents scheduled for late 1st Quarter, 2018 GMP documents for structure and dry-in components to be issued on January 22, 2018 David Clark

6 New Rehab Hospital Turner Construction
CONSTRUCTION PACKAGES – SCHEDULED BID TIMEFRAME, JANUARY, 22 – FEBRUARY 13 (SCHEDULED BID DUE DATE) Package Description Augercast Piles Roofing & Accessories (SBE-C Set-Aside) Exterior Framing, Sheathing, and Stucco Masonry (SBE-C Set-Aside) Sitework and Civil (partial) Waterproofing & Sealants Dewatering Cast-in-Place Concrete Spray-Applied Fireproofing

7 Jackson Health – Christine E. Lynn Rehabilitation Center
Milestone Schedule Activity Date Enabling and Institute and Annex Demolition complete April, 2018 Start test piles May, 2018 Top out steel December, 2018 Building Enclosed June, 2019 Substantial Completion Quarter 1, 2020 Demolition of Existing Rehab Quarter 2, 2020 DC

8 HOW TO DO BUSINESS WITH TURNER CONSTRUCTION COMPANY?
KEY QUESTION: HOW TO DO BUSINESS WITH TURNER CONSTRUCTION COMPANY? Four Steps in Doing Business with Turner Complete pre-qualification application Respond to Invitations to Bid Submit proposal timely Follow up

9 Turner On-Line Prequalification
The first step in our prequalification process is to have you access our website at to complete the Subcontractor/Vendor Prequalification Application. Please sign in to your computer as PRIVATE USER instead of public or shared. Otherwise the information will not be saved on the forms. Click on Create User and enter requested information. Once you hit submit you will be asked to enter your address and contact information. Once submitted you will then receive a username and password (allow up to 15 min.) that will allow you to log back in and complete the prequalification. When completing the prequalification application online please make sure to check “Orlando / Miami, Florida” as the geographical region you would like the prequalification application to be submitted. In the interest of expediting the process, we respectfully request you enclose the following in addition to your completed prequalification statement: Safety Experience Modification Rate (EMR) for the last three (3) years on letterhead from Insurance company (If your EMR is over 1.0 you must request a letter from your insurance company explaining what contributed to the high EMR and what safety measures you are now taking) OSHA 300/300A Logs for the last three (3) years A copy of your audited Financial Statement (not more than 12 months old), Reviewed Financials or Compiled on Accrual Basis Financials Current & Completed projects list - last 3 years Insurance Carrier Information – Sample Certificate of Insurance Letter from your Bonding Company Information indicating single project and aggregate capacity Completed and signed W-9 Form Certificates (MBE, WBE, DBE, etc.) If Applicable

10 UPCOMING CONTRACTING/BIDDING OPPORTUNITIES
SOUTH FLORIDA DMS Rohde Fire Alarm Replacement Project Description: Install new complete fire alarm system in entire complex which includes two (2) buildings and two (2) garage at the Rohde Building located in downtown Miami. Work will entail installation of new fire alarm system , demolition of old fire alarm system, misc. drywall and ceiling patching and painting. . Bid Packages: Electrical, Fire Alarm, Drywall and Paint. Approximate Bid Phase: Early 2nd Quarter 2018 CONTACT: Pete Lopez FOR MORE INFORMATION ON THE ABOVE PROJECTS (786) or FLL Terminal 2 Modernization Project Description: This project is a Modernization Program for Terminal 2 (T2) at Fort Lauderdale-Hollywood International Airport (FLL). Scope of the FLL T2 Modernization includes over 200,000 SF of major renovations and expansions at the Arrival Level, Departure Level, Mezzanine Level and Roof Level to meet modern security and design standards. The terminal will expand by ~20K SF, from ~30K SF to ~50K SF, increasing space in concessions, security and restrooms with minimal impacts to the aircraft apron which surrounds the building. Bid Packages: Core, Shell, Interior & Exterior Finishes, MEP’s, and Sitework Approximate Bid Phase: Mid-January 2018 through February 2018 CONTACT: Joe Harlow for interest in T2MP (786) or

11 TURNER CONTACTS: LARRY BLACKBURN VP – Florida Healthcare Director
ROBERT LEYVA Senior Project Manager CHAD NEWELL Project Superintendent ANDREW ROCCA Preconstruction Senior Estimator RHONDA WIMBERLY Community & Citizenship Director GREG WALKER Procurement Agent

12 FOSTER CONTACTS: ADRIAN FOSTER President – Foster Construction
Henry Harden Asst. Superintendent Dexter Foster II Asst. Estimator Julien David Asst. Project Manager

13 QUESTIONS


Download ppt "Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson"