Download presentation
Presentation is loading. Please wait.
1
US-LARP Task: IR Commissioning
(Part I) Low-beta triplet: surface fit-up, installation, individual system test support
2
Low-beta triplet surface fit-up - 2005
Check all interconnect elements (mechanical, electrical, instrumentation). Mount and check alignment equipment. Check string behaviour under insulation vacuum. Check handling equipment.
3
Interconnects
4
Interconnects
5
Q1 - Q2 Closure
6
Low-beta triplet in Bld 181
7
Tunnel installation
8
Activities in 2006 Technology transfer from Fermilab to the CRI/IEG team: Execution and oversight of electrical connections, warm ELQA tests on triplet string, preparation for welding of interconnect pipes on the first triplet (8L) in the period January-March 06. Repair of deliverables: Interconnect components D3 dipoles HTS leads instrumentation Repair of three low-beta quadrupoles damaged in transport: Transfer and setting up of the cryostating benches, transfer of cryostating procedures Last quadrupole (Q2) to be delivered beginning of 2007. Joining the commissioning teams ...
9
Fermilab Presence at CERN
Present project associates: Peter Limon (Nov May 2007) Assigned to AT-MEL Unofficial local LARP “leader”/Official LARP Safety Liaison Installation/ vacuum issues (IR and HC) Sandor Feher (Sept Aug 2007) Assigned to AT-MEL IR Magnets, HTS Leads (IR), Quench Protection (HC) Bob Flora (Oct Sept. 2007) Assigned to AT-MEL Quench Protection (HC) Roger Rabehl (Oct Sept. 2007) Assigned to AT-ACR IR Cryo, DFBX, HTS leads (IR), Cryo operations plant (HC)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.