Download presentation
Presentation is loading. Please wait.
Published byRafe Berry Modified over 5 years ago
1
Glenda Project – Microclimate & Severe Weather Research
Mobile Ground Station Applications Meteorological Sounding Rockets Dave Davis Web Site:
2
Dayton, WA – 2011 Test Flights
May 14th, June 11th, and October 1st Recovery Trajectories May 14th 7554 Booster – Aerotech I211 “Thunderstorm Intercept” Apogee: 2,706 Feet Ground Level Wind Speed: 4.5 mph June 11th 9875 Booster – CTI I170 Apogee: 2,211 Feet Ground Level Wind Speed: 10 mph October 1st 7554 Booster – Aerotech I211 Apogee: 2,354 Ground Level Wind Speed: 14.5 mph Note: The “Thunderstorm Intercept” Flight is 90 degrees from the normal Trajectory
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.