Hybrid & Module Testing Status
Week of 11/28-12/2 11/28-12/2
2
UCSB Hybrid Testing Status
11/28-12/2
3
UCSB ARCS Testing Status
11/28-12/2
4
UCSB ARCS Testing Failures
This Week 1 with too much current 1 with mechanical damage 5 failed on rod Added all failed on rod even within spec to be conservative 3 modules repaired this week Cumulative 9 with too much current 2 with >2% bad channels 1 with bad DCU Repairable 1 with CF frame shorted to HV 1 with bad Dec. Mode chip 1 with bad Peak Mode chip 1 with chip with too low noise 1 with bad chip 1 with funny LED test 1 with chip out of synch 6 failed on rod 1 CMN 1 with mechanical damage 11/28-12/2
5
UCSB ARCS Testing Results
2411 Total Tested 2381 Grade A 3 Grade B 27 Grade F This week: 21 of channels bad (0.047%) Total Production: 609 of channels bad (0.041%) 11/28-12/2
6
UCSB ARCS Testing Results
Total Production: 609 of channels bad (0.041%) This week: 21 of channels bad (0.047%) 11/28-12/2
7
UCSB Backplane Testing
11/28-12/2
8
UCSB LT Testing Status Failed module has too much current 11/28-12/2