Download presentation
Presentation is loading. Please wait.
Published byGenesis Greaves Modified over 10 years ago
1
Components, Receivers, and Instrumentation for Ground-Based mm/submm Astronomy B.Lazareff, G.Butin, M.Carter, J.Y.Chenu, A.L.Fontana, S.Mahieu, D.Maier, F.Mattiocco, P.Serres K.Schuster, N.Krebs, T.Scherer, M.Schicke
2
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff2 Outline Existing facilities Drivers for development Component technologies Ultimate limits Device development at IRAM SIS Mixers Receiving systems Instrumentation Future prospects
3
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff3 Present and Future Facilities IRAMALMA
4
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff4 Drivers for Receiver Development Sensitivity ! Ultimate limit: background limited Receiver : electronics, optics Atmosphere Photon statisitics Frequency coverage Tuning range. All atmospheric windows Instantaneous. Goal: one atmospheric window, several 10's of GHz! Speed (mapping) But also: Stability: amplitude, phase Linearity Polarization purity Reliability Cost (hardware and manpower)
5
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff5 Active Component Technologies SIS HEMT HEB
6
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff6 Active Component Technologies HEMT Direct amplification 115 GHz on telescopes; 200 GHz in the lab Instantaneous b/w ~ 30% SIS Heterodyne mixing 700GHz (Nb); >1THz (NbTiN) Instantaeneous b/w 2 x 8 GHz HEB Heterodyne mixing Several THz Instantaeneous b/w ~ 4 GHz
7
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff7 Active Component Technologies
8
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff8 Pushing the Limits of Ground-Based Observing: 1.037 GHz ! Meledin et al 2004 CFA, Cambridge, MA Moscow State University
9
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff9 Quantum Limit for SIS mixers (after A.R.Kerr)
10
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff10 Fundamental Limits versus State-of-Art (ALMA specs, SSB) Quantum Atm (0.5mm PWV, 1.4 airmass) ALMA SSB Spec Practical limit
11
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff11 Devices : SIS Junction Devt & Fab P2-I1-43.41-3 0 20 40 60 80 100 120 140 160 0123456 Voltage [mV] Current [µA]
12
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff12 Devices : SIS Junction Devt & Fab PdBI Band 1 (83-116 GHz) junction ALMA Band 7 (275-373 GHz) junction
13
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff13 Devices : HEB Mixer Devt & Fab Optimisation systématique des films minces NbN Mélangeur NbN : Courbe I/V et puissance IF
14
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff14 Devices : MEMs : Tunable Capacitors
15
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff15 SIS Mixers DSB SSB 2SB (sideband separating)
16
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff16 DSB Mixers : Results IRAM ALMA B7 Trec = 2 h /k SRON ALMA B9 Trec = 3 h /k
17
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff17 SSB Mixers (PdBI) : Principle of Operation
18
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff18 SSB Mixers; Results for PdBI 200-260 GHz
19
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff19 Sideband Separating (2SB) Mixers for ALMA Band 7 Band 7 (IRAM) 275 – 373 GHz
20
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff20 2SB SIS Mixer: Principle of Operation
21
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff21 ALMA Band 7 (IRAM) 2SB Mixers Results
22
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff22 ALMA Band 7 (IRAM) 2SB Mixers More Results
23
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff23 ALMA Band 7 (IRAM) 2SB Mixers More Results
24
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff24 Receiving Systems : PdBI New generation receivers for PdBI. 4 frequency bands Dual-Pol 4GHz wide IF #1 unit currently undergoing system test
25
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff25 Receiving Systems Atmospheric Phase Correction
26
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff26 Receiving Systems : ALMA B7 Cartridge 275 – 373 GHz Dual polarization Dual sideband USB+LSB Four IF outputs 4 – 8 GHz 147 K SSB maximum And many more specs…
27
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff27 Instrumentation : Antenna Range Herschel B1 horn verification 50 dB dynamic range @ 604 GHz ALMA B7 cartridge, optics verification >50dB dynamic range @ 300 GHz
28
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff28 Instrumentation : Vector Network Analyzer. 80 – 370 GHz
29
19-20 Sep 2005Hunt for Molecules. Rx Devt for IRAM & ALMA Telescopes. B.Lazareff29 Where Do We Go from Here ? Areas for Future Work Array receivers for mapping speed Push the IF b/w of SIS receivers to the limits: f/f ~ 10% ? Design integrated pixels Push HEMT receivers to lower noise and higher frequencies: 30K over 85 – 115 GHz ? ?? over 130 – 170 GHz ? Any really new detector around the corner ? Keep our spectral bands pollution-free !
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.