Download presentation
Presentation is loading. Please wait.
1
The SPL-based Proton Driver at CERN
OUTLINE 1. Introduction 2. SPL characteristics 3. On-going work 4. Staging 5. Summary and Conclusion R. Garoby for the SPL W.G. 1
2
SPL Working Group REFERENCE
Conceptual Design of the SPL, a High Power Superconducting Proton Linac at CERN Ed. M. Vretenar, CERN R. Garoby for the SPL W.G. 2
3
1. Introduction CERN baseline scenario for a Neutrino Factory
R. Garoby for the SPL W.G. 3
4
Other applications of the proton driver
Approved physics experiments CERN Neutrinos to Gran Sasso (CNGS): increased flux (~ ´ 2) Anti-proton Decelerator: increased flux Neutrons Time Of Flight (TOF) experiments: increased flux ISOLDE: increased flux, higher duty factor, multiple energies... LHC: faster filling time, increased operational margin... Future potential users “Conventional” neutrino beam from the SPL “super-beam” Second generation ISOLDE facility (“EURISOL” -like) LHC performance upgrade beyond ultimate… R. Garoby for the SPL W.G. 4
5
2. SPL characteristics H- source, 25 mA 14% duty cycle CCDTL
new SC cavities: b=0.52,0.7,0.8 Fast chopper (2 ns transition time) RF system: freq.: 352 MHz ampli.: tetrodes and LEP klystrons R. Garoby for the SPL W.G. 5
6
Improvements w.r.t. the reference design
Improved transitions between sections better beam stability Doubled period length above 1.1 GeV save 25 doublets, 8m, 3 MCHF Improved error studies 100% beam radius < 20 mm, even for large error case (30 %) quad. radius reduced from 100 mm to 60 mm, (17rms) save MCHF Reduced longitudinal emittance: 0.6 0.3 ºMeV improved design of the transfer line (drift length 230 175 m, bunch length 180 130 ps) Use of beta=0.8 cavities up to the highest energy shorter tunnel (- 100 m), less cavities per klystron, better control of mechanical resonances R. Garoby for the SPL W.G. 6
7
SPL beam specifications
R. Garoby for the SPL W.G. 7
8
Accumulator-Compressor scheme
R. Garoby for the SPL W.G. 8
9
Characteristics of the beam sent to the target
R. Garoby for the SPL W.G. 9
10
Layout on the CERN site (top view)
R. Garoby for the SPL W.G. 10
11
Cross section R. Garoby for the SPL W.G. 11
12
3. On-going work R. Garoby for the SPL W.G. 12
13
Collaboration on RFQs with CEA-IN2P3 (IPHI) and INFN Legnaro
Progress highlights Chopper structure 3 D view of a coupled cavity drift tube module (CCDTL) Scaled model (1 GHz) in test Full performance prototype tested Driver amplifier in development Collaboration on RFQs with CEA-IN2P3 (IPHI) and INFN Legnaro 352 MHz test place prepared (planned tests of CEA-built DTL structures in 2002) R. Garoby for the SPL W.G. 13
14
Chopper Travelling wave electrostatic deflector, meander line to match beam and wave velocity Used to create gaps in the linac bunch distribution between accumulator buckets Needs very short rise/fall times (2 ns !) to avoid partially deflected bunches Development of pulser 198+2mm (33 cells) 50 mm accumulator bucket R. Garoby for the SPL W.G. 14
15
Study of RT structures for the SPL front-end
bl Alvarez Drift Tube Linac unsurpassable <20 MeV good but expensive for MeV bl Cell Coupled Drift Tube Linac attractive solution for MeV (a cold model is being designed) bl/2 Coupled-Cell Cavity (LEP1) better efficiency >110 MeV quadrupole quadrupole The final choice will depend on preferred apertures, RT final energy, etc. R. Garoby for the SPL W.G. 15
16
Superconducting cavities
CERN technique of Nb/Cu sputtering for b=0.7, b=0.8 cavities (352 MHz): excellent thermal and mechanical stability (very important for pulsed systems) lower material cost, large apertures, released tolerances, 4.5 K operation with Q = 109 The b=0.7 4-cell prototype Bulk Nb or mixed technique for b=0.52 (one 100 kW tetrode per cavity) R. Garoby for the SPL W.G. 16
17
RF and Superconducting cavities Parameters
R. Garoby for the SPL W.G. 17
18
Pulsed operation of a LEP klystron set-up
RF output power (800 kW max.) Mod anode driver 5 ms/div 1 ms/div 14/05/ H. Frischholz Þ LEP power supplies and klystrons are capable to operate in pulsed mode after minor modifications R. Garoby for the SPL W.G. 18
19
RF power distribution & field regulation in the superconducting cavities
Effect on field regulation Effect on the beam Þ unsolved problem ! Needs work Þ similar difficulties are likely in the muon accelerators... R. Garoby for the SPL W.G. 19
20
4. Staging Test of the 3 MeV H- injector
Means: strengthen collaboration with the CEA-IN2P3 and jointly exploit the IPHI set-up Contribute to the chopper and bunchers 120 MeV H- linac in the PS South Hall Goal: increase beam intensity for CNGS and improve characteristics of all proton beams (LHC, ISOLDE…) Under study: detailed design report with cost estimate in 2003 Needs new resources (collaborations, manpower, money) SPL R. Garoby for the SPL W.G. 20
21
Proton Intensity increase:
location of the SPL front-end in the PS South Hall PS To the PSB Beam dump H- source LEIR Þ Increased brightness for LHC, ´ 1.8 the flux to CNGS & ISOLDE, … (with upgrades to the PSB, PS & SPS) Þ “cheap” installation, giving benefits from SPL related hardware before the full machine is operational & shortening the final setting-up R. Garoby for the SPL W.G. 21
22
5. Summary and Conclusion
The SPL design is improving Work is started on most items, based on collaborations A staged approach is proposed Feedback (and support !) is needed from potential users R. Garoby for the SPL W.G. 22
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.