Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGs Singapore Closing Report

Similar presentations


Presentation on theme: "TGs Singapore Closing Report"— Presentation transcript:

1 TGs Singapore Closing Report
March 2011 doc.: IEEE s March 2011 TGs Singapore Closing Report Date: Author: Name Address Affiliation Phone Guido R. Hiertz Riedel Communications GmbH & Co. KG, Uellendahler Straße 353, Wuppertal, Federal Republic of Germany Philips Guido R. Hiertz (Philips) Guido R. Hiertz (Philips)

2 TGs closing report for the March 2011 meeting.
doc.: IEEE s March 2011 Abstract TGs closing report for the March 2011 meeting. Guido R. Hiertz (Philips) Guido R. Hiertz (Philips)

3 March 2011 Status Before meeting TGs passed its second recirculation based on Draft 9.0 with 95.0% approval rate (closed: ) We received 291 comments 5 general comments 142 editorial comments 144 technical comments During meeting The group resolved all comments The group approved the third SB recirculation Guido R. Hiertz (Philips)

4 IEEE 802 Tutorial TGs presented a tutorial on 802.11s D9.0
March 2011 IEEE 802 Tutorial TGs presented a tutorial on s D9.0 , 19:30 – 21:00 Well attended Good discussion ~5 attendees asked detailed questions 20 min to 25 min discussion Available in s from Guido R. Hiertz (Philips)

5 Timeline review TGs reviewed the timeline
March 2011 Timeline review TGs reviewed the timeline TGs is aware of the need for fast progress TGs works hard to finish early to be included in Currently envisaged scenario date Recirculation March 2011 SB Ballot on draft 11 SB Ballot on unchanged draft 11 Request EC Unconditional Approval to go to Revcom Revcom approval September 2011 Publication Guido R. Hiertz (Philips)


Download ppt "TGs Singapore Closing Report"

Similar presentations


Ads by Google