Download presentation
Presentation is loading. Please wait.
Published byMarvin Wilkinson Modified over 5 years ago
1
Estimation Method of Moments Industrial Engineering
2
Method of Moments Recall from Data Analysis, we had three measures for failure time data s2 = X 1 . 19 =
3
Method of Moments For Failure Time data, we now have three measures for the data Exponential ?? s2 = X 1 . 19 =
4
Method of Moments Recall that for the exponential distribution m = 1/l s2 = 1/l2 If E[ X ] = m and E [s2 ] = s2, then 1/l = 19.1 X 1 . 19 = s2 = l 0524 . ˆ =
5
Method of Moments Recall that for the exponential distribution m = 1/l s2 = 1/l2 If E[ X ] = m and E [s2 ] = s2, then 1/l = 19.1 or 1/l2 = X 1 . 19 = s2 = l 0524 . ˆ = l 0575 . ˆ =
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.