Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sub Working Group 2 Protocols & Messages

Similar presentations


Presentation on theme: "Sub Working Group 2 Protocols & Messages"— Presentation transcript:

1 Sub Working Group 2 Protocols & Messages
Car2Car Forum Mainz, Sub Working Group 2 Protocols & Messages Presented by Jörn Edlich, CETECOM Sebastian Müller, ETSI

2 Sub Working Group 2 Content
Identification of Requirements related to Facilities and Networking layer CAM, DENM, GN Requirements defined based on: C2C Basic System Standards Profile ETSI Base Specifications Goal is to ensure protocol conformance Resulting Protocol Conformance Tests Provided in Human readable format Implemented in TTCN-3 WG Arch

3 Status Update Sub Working Group 2
Current Status Requirements sheets complete (version v25) First release of Test cases complete V1.0.0 Issues on BSSP v1.0.4 reported to Bugzilla 1st verification event executed in March 2015 at Plugtest Helmond GNSS scenarios and replay functionality implemented in all test cases 2nd verficiation event planned for November 2015 5/17/2019 WG-CA – SG 2 Status

4 Test Cases and Requirements
69 testable requirements identified overall 13 CAM, 26 DENM, 30 Network and Transport Layer 94 Test cases overall 28 Prio 1 (12 CAM + 14 DENM + 2 GN) (new developed test cases) 53 Prio 2 (13 CAM + 23 DENM + 17 GN) (ETSI mapped test cases) 13 Prio 3 (13 GN) (ETSI req. , no correlating C2C req. available yet but essential protocol features) mandatory for certification 5/17/2019 WG-CA – SG 2 Status

5 HIL test setup Test case DB Upper Tester Commands via Ethernet
Test Controller CAN messages CAN replayer (only for PoTi test cases) Proxy (Convert CAN messages, optional) CAN Diag Ethernet CAN RF GPS signals GNSS replayer Upper Tester App App 1 App 2 Logging + Analysis FAC 11p 11p signals NET PHY DUT (ITS Station) 5/17/2019 WG-CA – SG 2 Status

6 HIL test setup (picture taken at ETSI Plugtest)
5/17/2019 WG-CA – SG 2 Status

7 Challenges Mapping of ETSI requirements to C2C BSSP requirements
investigation on what is redundant and where are new test cases to be developed Verify the new developed and implemented test cases Verification events Test cases related to traces, path history, path points and message generation rules missing GNSS replay functionality in first set of test cases External GNSS simulator to replay geolocation and timing data WG-CA – SG 2 Status

8 (Helmond ETSI Plugtest, March 2015)
Verification event Goal is to verify the correct implementation of the test cases Companies invited to verify the test cases with their equipment implementation Depending on results and analysis test cases: to be reworked accepted Status today New version including GNSS replayer Initial implementation stable version (no GNSS replayer) bugzilla Resulution implemented Final version bug fixes bug fixes bug fixes Bug report Bug report Bug report 1st verification event (Helmond ETSI Plugtest, March 2015) 2nd verification event (CETECOM, Q4/2015) 3rd verification event (final release) WG-CA – SG 2 Status

9 Results of 1st verification event (1/2)
Precondition: 29 test case written by external companies (FSCOM & TestingTech) Test cases verified in verification event Verification done by 6 manufacturers Outcome: Overall pass rate was around 55% (16 of 29 tests) Investigation on failed test cases showed some test script implementation erros Some test cases need to be reworked Next steps: Test cases reworked and optimized Test cases to be revalidated in 2nd verification event 5/17/2019 WG-CA – SG 2 Status

10 Results of 1st verification event (2/2)
5/17/2019 WG-CA – SG 2 Status

11 Open points / next steps
Providing Input for Working Group Compliance Assessment Whitepaper Implementation of bugzilla resolutions (requirements update) Planning (final) verification event for new developed test cases verification of Test System and Test Cases with GNSS replayer features (test cases available since end of October) Finalizing the Scope of Compliance Assessment 5/17/2019 WG-CA – SG 2 Status

12 5th C-ITS Plugtest 2016 Date: 7 – 18 November 2016
Location and Host: TBD Organized with ERTICO, Supported by EC Test Infrastructure extension with Traffic Management components Based on Central System, Traffic Controller and RSUs Support from Siemens. Any other suppliers are welcome Scope End-to-end Interop Tests SPAT, MAP, IVI, CAM, GN Selected use cases from TR Release 1 revision and EC projects PKI Trust Center (Certificate Management) DCC tests (under study) Mitigation CEN DSRC and ITS G5 Conformance Car Drive Tests WG-CA – SG 2 Status

13 System Architecture – example ECo-AT
WG Arch

14 Jörn Edlich Tel.: +49 (0) 173 87 80 286 joern.edlich@cetecom.com
5/17/2019 WG-CA – SG 2 Status

15 Backup 5/17/2019 WG-CA – SG 2 Status

16 Test case overview Test purposes are defined
Test cases are implemented in TTCN-3 language on the test system are executed automatically via the test system 5/17/2019 TF-CA – Sub WG 2 Status

17 Requirement topics Application FAC GN Access Facility Layer (CAM&DENM)
Generation Frequency (CAM) Path History (CAM & DENM) Expiry Handling (DENM) Periodic Retransmission (DENM) Trace (DENM) Geo-Networking Beaconing Single Hop Broadcast Next Hop Selection Geo Broadcast Forwarding Algorithm Duplicate Address Detection Protocol Stack Application FAC GN Access 5/17/2019 TF-CA – Sub WG 2 Status


Download ppt "Sub Working Group 2 Protocols & Messages"

Similar presentations


Ads by Google