Download presentation
Presentation is loading. Please wait.
1
Model A 1 050-003-109 1+1+1 H Y J 2 Batterycover Revision : Client :
Slider qty : 1 Model : Lifter qty : Part name : Gate type : Site gate Part no.. : Cavities : 1+1+1 DFM by : H Y J 2/3 Plate : 2 Sagem GSM DESK PHONE Batterycover
2
DFM follow-up issue. Integral Corrective Action List
ICAL ICAL 1 - Date of opening (all dates in 2005) 2 - Date of beginning of action 3.- Date foreseen for validation DFM follow-up issue Integral Corrective Action List 4 – Date of validation (closing) Page Open points Solutions / Action Who 1 2 3 4 P.3 Gate (mold flow) Waiting for confirmation. 28/09 P.4 Parting line P.5 Slider P.6 Draft angle Waiting for confirmation
3
Gate (mold flow) overlap gate
4
Parting line Cavity Core
5
Slider slide
6
1. The yellow color surface
Draft angle 1. The yellow color surface No draft angle 2. Where need texture? Please add enough draft angle for the texture. 3. For the ribs, side surface in the cavity/ core and sliders, we will make a draft angle less than 2 degree (reduce plastic). But we will keep the tolerance.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.