NPS Layout on SHMS Carriage: Sweep Magnet
WACS H(g, g p), Wide angle H(g, p0p) DVCS H(e,e’ g)p, Deep H(e,e’ p0)p Proton to HMS PbWO4 g- e– to HMS January 28, 2019 NPS C. Hyde
2
Sweep Magnet replaces SHMS Horizontal Bender
Looking upstream g-aperture extends to 2° from beam line.(at smallest angle setting) Ready for power, cooling Magnetic field mapper constructed at ODU January 28, 2019 NPS C. Hyde
3
More Photos Water cooling in test-lab limited to 200A
~20% of full power January 28, 2019 NPS C. Hyde
4
Magnet Mapper. XYZ motor control
ODU graduate student Mitch Kerver at the controls Hall Probe recording now added January 28, 2019 NPS C. Hyde
5
Status of Project Construction: Path to completion
Progress to completion: 90% Magnet complete Stand for SHMS Platform required Design completed(?), construction? Path to completion Test water flow Continuity tests done? Map magnetic field at 20% strength Mapper construction 90% complete Hall Probes available at ODU & JLab Software to control mapper motion and record data complete Move to Hall C and map field at full strength Estimated completion time August 2019 (pending access to Hall, power, cooling, etc) January 28, 2019 NPS C. Hyde
6
Sweeper Magnet to-do list
Raise magnet 8-12 in (match to design for stand) Fabricate Hall-Probe Bracket Bring mapper to Test Lab for “dry-run” without magnet power. Return to ODU for any adjustments/refinements Energize magnet in Test Lab Establish safe field perimeter What are protocols for user control? Map field in sweep-gap and beam-gap Transfer magnet and power supply to Hall C Energize to full field and map, especially in beam-gap. January 28, 2019 NPS C. Hyde