SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.

Similar presentations


Presentation on theme: "SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019."— Presentation transcript:

1 SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation
Antonio Grande EN-ACE 06-Mar-2019

2 Magnet exchange campaign status
Vacuum sector Zone Position Type aimant SN Interaction projets Week out Week in Proposed schedule Status 111 1- 10550 MBB MB 9 48 (2019) 3 (2020) With aCcoating 10670 MB 369 112 11030 MBA MA 181 120 1+ 11610 QFA QA Enlevé pour LIU-SBDS With LIU-SBDS 135 11710 QDA QA 141 11810 QA 210 2- 20230 MA 268 8 (2020) 13 (2020) 20470 MB 130 13 (2020) 251 2+ 22110 QD Q 23 10 (2019) 12 (2019) Mar-19 261 22530 MB 203 22550 MB 74 23090 MB 160 22510 Q 16 262 23310 Q 220 3- 23530 MB 143 30090 MB 417 311 30210 QF Q 36 Done 312 30870 MB 8 19 (2019) 25 (2019) 30890 MB 118 321 31610 Q 96 Enlevé pour LIU-RF With LIU-RF Magnet extracted 332 31710 Q 105 334 31810 Q 149 336 31910 Q 28 361 3+ 32770 MA 150 14 (2019) 32890 362 4- 40090 MB 76 14 (2019) 19(2019) 412 40750 MB 94 8 (2019) 461 4+ 42530 MB 103 25 (2019) 27 (2019) With QD Jun19 462 5- 50030 MA 82 3 (2019) 8 (2019) Now 511 50350 MB 86 520 51610 Q 73 522 5+ 51810 Q 196 530 51910 Q 900 651 6+ 62050 MA 172 62110 Q 11 Two new magnets added to the campaign in LSS3 Previous works are performed properly Delay in magnet campaign: Some works foreseen for week 10 are delayed due to a problem with alignment jacks This issue is being tested and by next week there will be a proposed solution The delay can be from 1 week to several months depending on the results 5/19/2019 Antonio Grande EN-ACE

3 Vacuum sectors situation at 04/03/2019
Sectors Opened 30/67 Opened/Scheduled Next 2 weeks 30/24 4 Point 1 Arc 1- (2/2) 111 112 LSS 1 (8/11) 120 134 – current 135 – current 136 – current 141 – current 142 – current 143 150 Arc 1+ (2/2) 161 162 TT10 (1/1) Point 2 Arc 2- (1/1) 210 – current LSS 2 (5/6) 220 231 233 240 251 Arc 2+ (2/2) 261 262 TT20 (1/1) Point 3 Arc 3- (2/2) 311 312 LSS 3 (9/9) 321 331 332 333 334 335 336 337 351 Arc 3+ (2/2) 361 362 Point 4 Arc 4- (2/2) 411 412 LSS 4 (5/6) 420 421 425 430 435 Arc 4+ (2/2) 461 462 TI8 (1/1) Point 5 Arc 5- (2/2) 511 512 LSS 5 (5/5) 520 – current 521 – current 522 – current 530 – current 550 – current Arc 5+ (2/2) 561 562 Point 6 Arc 6- (2/2) 611 612 LSS 6 (6/8) 621 631 632 634 635 640 651 Arc 6+ (2/2) 661 662 TT60 (1/1) Point 7 TI2 (1/1) TT66 is not going to be vented finally, so just 67 sectors vented in total (if anyone plans to do something, send me a mail s.251, s.261, s.262, s.651 opening is postponed due to magnet campaign alignment issue Week 10 5/19/2019 Antonio Grande EN-ACE

4 Vacuum sectors situation at 20/02/2019
Sectors Closed 3/69 Opened/Scheduled Next 2 weeks 3/0 Point 1 Arc 1- (2/2) 111 112 LSS 1 (6/10) 120 134 – LS2 135 – LS2 136 – LS2 142 – LS2 143 150 Arc 1+ (2/2) 161 162 TT10 (1/1) Point 2 Arc 2- (2/2) 211 – LS2 212 – LS2 LSS 2 (5/6) 220 231 233 240 251 Arc 2+ (2/2) 261 262 TT20 (1/1) Point 3 Arc 3- (2/2) 311 312 LSS 3 (11/11) 321 - LS2 331 - LS2 332 - LS2 333 - LS2 334 - LS2 335 - LS2 336 - LS2 337 - LS2 338 - LS2 339 - LS2 351 Arc 3+ (2/2) 361 362 Point 4 Arc 4- (2/2) 411 412 LSS 4 (5/6) 420 421 425 430 435 Arc 4+ (1/2) 461 462 TI8 (1/1) Point 5 Arc 5- (2/2) 511 512 LSS 5 (6/6) 521 - LS2 530 - LS2 531 - LS2 532 - LS2 533 - LS2 550 - LS2 Arc 5+ (2/2) 561 562 Point 6 Arc 6- 611 612 LSS 6 (6/8) 621 631 632 634 635 640 651 Arc 6+ (2/2) 661 662 TT60 (1/1) Point 7 TI2 (1/1) Week 10 5/19/2019 Antonio Grande EN-ACE

5 LSS1 Current and next two weeks situation 5/19/2019
Current situation Next two weeks situation 5/19/2019 Antonio Grande EN-ACE

6 LSS2 Current and next two weeks situation 5/19/2019
Current situation Next two weeks situation 5/19/2019 Antonio Grande EN-ACE

7 LSS3 Current and next two weeks situation 5/19/2019
Current situation Next two weeks situation 5/19/2019 Antonio Grande EN-ACE

8 LSS4 Current and next two weeks situation 5/19/2019
Current situation Next two weeks situation 5/19/2019 Antonio Grande EN-ACE

9 LSS5 Current and next two weeks situation 5/19/2019
Current situation Next two weeks situation 5/19/2019 Antonio Grande EN-ACE

10 LSS6 Current and next two weeks situation 5/19/2019
Current situation Next two weeks situation 5/19/2019 Antonio Grande EN-ACE

11 All comments are more than welcome but please let me know by mail
Thank you