Presentation is loading. Please wait.

Presentation is loading. Please wait.

Center City Connector Fall Open House Presenter: Ethan Melone,

Similar presentations


Presentation on theme: "Center City Connector Fall Open House Presenter: Ethan Melone,"— Presentation transcript:

1 Center City Connector Fall Open House Presenter: Ethan Melone,
Rail Transit Manager at City of Seattle

2 Welcome! Center City Connector Open House Purpose
Review the project design and construction plans Learn about the environmental process Hear about next steps for Center City Connector 2

3 Our mission, vision, and core values
Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products Committed to 5 core values to create a city that is: Safe Interconnected Affordable Vibrant Innovative For all Our core values for transportation anchor to the core values that Mayor Murray has laid out in his vision (Move Seattle) for Seattle: Safe Interconnected Affordable Vibrant Innovative 3

4 Presentation overview
Seattle Streetcar System Center City Connector Project overview Cost and funding Project history and schedule What we heard from you Key project features Connection with other modes and neighborhoods Project segments Construction Environmental Assessment Next steps What you can learn tonight May 21, 2019 4

5 Seattle Streetcar System
Seattle’s 5.5-Mile System South Lake Union (opened in 2007) First Hill (testing in progress) Broadway Extension Center City Connector May 21, 2019

6 First Hill Streetcar Current status Construction completed in 2014
Manufacturing delays impacted startup process Startup Activities July-Sept: Testing and tuning streetcar vehicle control systems Sept: Vehicle performance acceptance testing Next steps: Reliability testing and pre-revenue service simulation Ongoing: Streetcar operator training Revenue Service Operations Grand opening-TBD May 21, 2019 6

7 Broadway Streetcar Extends First Hill line through Broadway commercial core Currently in final design Open houses planned for Nov. 14 and 19 May 21, 2019 7

8 Center City Connector May 21, 2019 8

9 Cost and funding Project cost: $135 million (includes $20 million in utility upgrades) Operating cost: $15 million per year (entire Streetcar system) May 21, 2019 9

10 Project history and schedule
May 21, 2019 10

11 What we heard from you November 2014 Open House
Prefer Stewart rather than Pike/Pine alignment or mixed alignment with east-west segment Work within existing design context of neighborhoods Faster construction with more detours preferable to more gradual construction with fewer detours May 21, 2019 11

12 Key project features Exclusive transitway
Very frequent service (5-minute headways) Reliable travel time (10 minutes, Westlake to Occidental) Multi-modal connections Access to parking facilities May 21, 2019 12

13 Multi-modal connections
Center City Connector will connect passengers with ferries, light rail, Amtrak and Sounder trains. May 21, 2019 13

14 Park once and ride the streetcar
Downtown parking garages are strategically located so that visitors, residents, and employees can park once and walk or take the Streetcar to multiple destinations. May 21, 2019 14

15 Center City Connector segments
May 21, 2019 15

16 Pioneer Square May 21, 2019 16

17 First Avenue Core May 21, 2019 17

18 Pike Place Market May 21, 2019 18

19 Stewart/Olive May 21, 2019 19

20 Construction options Start: As early as fall 2016 (utility relocations) Timeline: months Construction options Option A: Shortest overall duration (12 months), largest work zones (6 to 8 blocks), fewer summer impacts Option B: Intermediate duration (18 months), medium work zones (4 to 5 blocks), fewer summer impacts Option C: Largest duration (24 months), smallest work zones (2 to 3 blocks), work continues through holidays and summers May 21, 2019 20

21 Environmental Assessment
Public review and comment The Environmental Assessment will be issued in late October/early November with a 30-day public comment period Review the document Seattle Central Library Online at seattlestreetcar.org/centercity.htm May 21, 2019 21

22 Next steps Late October/Early November
Issue EA and begin 30-day public comment period Final design and additional public input Secure funding (federal and local match) Planning for construction Possible early utility work Ongoing property owner outreach and community briefings May 21, 2019 22

23 What you can learn today
Talk to staff and review information about: Plans for each segment Operations Construction Cost and funding EA process and comment period Information about other related projects in the area` May 21, 2019 23

24 Thank you! May 21, 2019 24

25 centercitystreetcar@seattle.gov | (206) 615-1070
Stay involved | (206) seattlestreetcar.org/contact.htm facebook.com/SeattleStreetcar @TheStreetcar


Download ppt "Center City Connector Fall Open House Presenter: Ethan Melone,"

Similar presentations


Ads by Google