PRODUCTION AND OPERATIONS MANAGEMENT
Ch. 8: Capacity Planning POM - J. Galván
2
Definition and Measures of Capacity
Designed Capacity: Effective capacity or utilization: Rated Capacity: The maximum output of a system in a given period The maximum capacity that can be achieved under ideal conditions The percent of design capacity actually expected Maximum usable capacity of a particular facility RC = (Capacity)(Utilization)(Efficiency) POM - J. Galván 38
3
Utilization Measure of planned or actual capacity usage of a facility, work center, or machine Expected c apacity Utilizatio n = Capacity Planned ho urs to be used = Total hour s availabl e POM - J. Galván 40
4
Efficiency Measure of how well a facility or machine is performing when used Actual out put Efficiency = Effective capacity Actual out put in uni ts = Standard o utput in u nits Average ac tual time = Standard t ime POM - J. Galván 41
5
Capacity Planning Process
Forecast Demand Develop Alternative Plans Quantitative Factors (e.g., Cost) Compute Rated Capacity Evaluate Capacity Plans Qualitative Factors (e.g., Skills) Compute Needed Capacity Select Best Capacity Plan Implement Best Plan POM - J. Galván 42
6
WHY PLANNING CAPACITY? POM - J. Galván
7
TYPICAL QUESTIONS How many machines should be purchased?
How many workers should be hired? Consequences of a 20% increase in demand? How many counters should be opened to maintain customer wait below 10 minutes? How many assembly stations are needed to maintain backorders below 20? How often will all 6 operating rooms be full? How will congestion at Logan change if a 5th runway is built? POM - J. Galván
8
CAPACITY ALTERNATIVES
Add Facilities Add long lead time equipment Schedule Jobs Schedule Personnel Allocate Machinery Subcontract Add Equipment Add Shifts Add Personnel Build or Use Inventory Long Range Planning Intermediate Range Planning Short Range Planning Modify Capacity Use Capacity * *Limited options exist POM - J. Galván
9
Theory of Constraints Identify the system bottleneck(s)
Exploit the bottleneck(s) Subordinate all other decisions to step 2 Elevate the bottleneck(s) Do not let inertia set in This slide presents the basic elements of the Theory of Constraints as listed in the text. POM - J. Galván 4-9 14
10
Capacity Bottlenecks To customers Inputs 1 2 3 200/hr 200/hr 50/hr
This slide and the next are based on Figure 4.1. The Figure is shown in two sections to improve legibility. (a) Operation 2 a bottleneck POM - J. Galván 4-10 14
11
Capacity Bottlenecks To customers Inputs 1 2 3 200/hr 200/hr 200/hr
(b) All operations bottlenecks POM - J. Galván 4-11 15
12
Capacity Cushion Reserve capacity used to deal with sudden increases in demand (100% - Average Utilization %) Primary Disadvantage unused capacity costs money POM - J. Galván
13
Economies & Diseconomies of Scale
250-bed hospital 750-bed hospital 500-bed hospital Average unit cost (dollars per patient) Economies of scale Diseconomies of scale Output rate (patients per week) POM - J. Galván 17
14
Capacity Strategy Expansionist Strategy
Looking to capture strong economies of scale Positive learning Planned Capacity Capacity Expected Demand Time POM - J. Galván
15
Capacity Strategy Build-to-Forecast Strategy
Trying to match capacity and demand Planned Capacity Capacity Expected Demand Time POM - J. Galván
16
Capacity Strategy The Maximize Utilization Strategy
Maintains little or no capacity cushion Expected Demand Capacity Planned Capacity Time POM - J. Galván
17
Systematic Approach to Capacity Decisions
Estimate Capacity Requirements Identify Gaps Develop Alternatives Evaluate Alternatives POM - J. Galván
18
[Dp + (D/Q)s]product 1 + ... + [Dp + (D/Q)s]product n
Capacity Decisions Estimate Capacity Requirements Example 4.1 Item Client X Client Y Annual demand forecast (copies) (D) Standard processing time (hour/copy)(p) Average lot size (copies per report)(Q) Standard setup time (hours)(s) Using the copy center example (Example4.1), this is the basic information. [Dp + (D/Q)s]product [Dp + (D/Q)s]product n N[1 – (C/100)] M = POM - J. Galván 4-18 31
19
(250 days/year)(1 shift/day)(8 hours/shift)(1.0 – 15/100)
Capacity Decisions Estimate Capacity Requirements Example 4.1 Item Client X Client Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) We substitute in the basic information.. [2000(0.5) + (2000/20)(0.25)]client X + [6000(0.7) + (6000/30)(0.4)]client Y (250 days/year)(1 shift/day)(8 hours/shift)(1.0 – 15/100) M = Used capacity: 85% POM - J. Galván 4-19 33
20
Capacity Decisions Estimate Capacity Requirements
Example 4.1 Item Client X Client Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) The equation is solved and the number of machines is known. Notice the rounding up, necessary to actually meet the capacity requirements. 5305 1700 M = = 4 machines POM - J. Galván 4-20 35
21
Waiting-Line Models Often used in Capacity Planning
Balances customer service & the cost of extra capacity Use probability distributions to estimate: Avg.Customer Delay Avg. Length of Waiting Lines Work Center Utilization POM - J. Galván
22
Simulation A tool that helps identify: More effective for
Process Bottlenecks Capacity Cushions More effective for complex waiting-line problems POM - J. Galván
23
Capacity Decisions Simulation Figure 6.5(a)
The first slide shows the operational backlog over the three days of the simulation. POM - J. Galván 51
24
Capacity Decisions Simulation 4-24 Figure 4.8
The final slide shows the utilization at the violations subprocess, the station with the biggest backlogs. POM - J. Galván 4-24 51
25
Managing Existing Capacity
Demand Management Capacity Management Vary prices Vary promotion Change lead times (e.g., backorders) Offer complementary products Vary staffing Change equipment & processes Change methods Redesign the product for faster processing POM - J. Galván 43
26
Complementary Products
Sales (Units) 5,000 Total 4,000 Heavy clothes 3,000 2,000 1,000 Light clothes J M M J S N J M M J S N J Time (Months) POM - J. Galván 44
27
Matching Capacity to Demand
Demand Management vary prices change lead times encourage/discourage business Capacity Management adjust staffing adjust equipment and processes change methods to facilitate production redesign the product to facilitate production POM - J. Galván 45