Download presentation
Presentation is loading. Please wait.
Published byEustacia Liliana Morris Modified over 5 years ago
1
Closing Report Date: 2010-05-21 Authors: May 2010 May 2010
doc.: IEEE /0679r0 May 2010 Closing Report Date: Authors: Clint Chaplin, Chair (Samsung) Clint Chaplin, Chair (Samsung)
2
Closing report for WNG SC for May 2010, Beijing, PRC
doc.: IEEE /0679r0 May 2010 Abstract Closing report for WNG SC for May 2010, Beijing, PRC Clint Chaplin, Chair (Samsung) Clint Chaplin, Chair (Samsung)
3
Two presentations at May 2010 meeting
doc.: IEEE /0679r0 May 2010 Two presentations at May 2010 meeting Carrier-Grade Operating in Paired Spectrum ( wng-carrier-grade operating-in-paired-spectrum.ppt) – Roberto Aiello Introduction to OTA Testing of MIMO Devices ( ac-introduction-to-ota-testing-of-mimo-devices.pdf) – Garth Hillman Minutes r0 Plans for July 2010 2 2 hour sessions Clint Chaplin, Chair (Samsung) Clint Chaplin, Chair (Samsung)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.