Download presentation
Presentation is loading. Please wait.
1
High Level Features of UK-Link Replacement
8th November 2006
2
High Level Features Supports service lines currently defined in the ASA and associated UNC processes. Scope to improve interfaces with users in order to make use of new technologies. Design intended not to preclude the potential integration of SPA processes for iGTs. Assumed no major change in transaction rates. Flexible design to reduce the cost of likely future change. Sufficient storage capacity to meet future data growth for the next five years based on current growth rates. No significant regime changes before commencement of replacement.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.