WG A Ecological Status Rivers intercalibration – update on progress of groups with 6-month extension
2
River groups with extension
Mediterranean GIG – all BQEs (except Fish) EC GIG – Macrophytes and Phytobenthos Large Rivers – Phytobenthos and Invertebrates Additional issue: macrophytes for NO GIG
3
MED GIG Progress with the work done by the Portuguese coordination theme No new Milestone delivered because the outcomes have not yet been discussed with the participating Member States – no new info to present to ECOSTAT Full results and draft final milestone report expected soon Final meeting October to endorse final results
4
EC GIG Updated Milestone reports available on CIRCA Macrophytes:
Methods available, data set in place Problems with RC – solution: ‘continuous benchmarking EC GIG can take advantage of the now finalized work in the CB GIG Phytobenthos: Analysis under way No major problems expected (?) Detailed Milestone reports expected with final resuts expected for next ECOSTAT
5
Large rivers Progress with the work done by the DE coordination theme
Phytobenthos, Benthic Invertebrates No new Milestone delivered – no new info to report Full results and draft final milestone report expected in time to be included in the current IC
6
Macrophytes in NO GIG Macrophytes work never started in NO GIG
JRC has asked the MS for clarifications UK: macrophyte method intercalibrated in CB GIG, considers that they have fulfilled their IC obligations SE, FI, NO have put together a (draft) document explaining the situation: SE, FI, NO have no final methods at the moment All three countries foresee such methods in the future: NO already late 2012 SE has recently started a research project FI sees this as something for future development
7
Macrophytes in NO GIG - Conclusions
No macrophyte methods in the NO countries at the moment No NO macrophytes in the 2011 intercalibration Methods are in development – up to NO MS to intercalibrate them when ready Propose to distribute the note prepared by the NO countries to ECOSTAT
8
Method checking for the intercalibration exercise: what methods can be included in the exercise?
ECOSTAT paper summarizing the situation and proposing solutions for problems encountered by the GIGs when applying the existing guidance (it is not a new guidance document) General issues (e.g. not all aspects of a BQE covered; no response to pressure demonstrated) and specific issues for the BQEs General recommendation: IC groups and/or MS should provide justifications that are strong enough to pass scientific peer review
9
Status of the paper… SCG May: No need to have it endorsed by SCG/Water Directors as it is not a guidance document Paper updated after last ECOSTAT meeting version 2.0 of 16 May 2011 taking into account the comments received Propose not to have another discussion/revision of the paper, but to bring up relevant issues with the intercalibration results