Presentation is loading. Please wait.

Presentation is loading. Please wait.

BRIDGING THE GAP UNTIL THE ARMY FIELDS A NEW RECON PLATFORM

Similar presentations


Presentation on theme: "BRIDGING THE GAP UNTIL THE ARMY FIELDS A NEW RECON PLATFORM"— Presentation transcript:

1 BRIDGING THE GAP UNTIL THE ARMY FIELDS A NEW RECON PLATFORM
ARNG CONCEPT BRIDGING THE GAP UNTIL THE ARMY FIELDS A NEW RECON PLATFORM AC Enhanced CAB’s (ECAB) 38 UH-60, 15 HH-60, 12 CH-47 45 AH-64, 12 RQ-7, 12 MQ-1C CAB (Full-Spectrum) (x8) AC Retain 8 X ECAB – Transfer 2 to ARNG AC uses AH-64E to bridge gap until new recon platform can be fielded into the ARS AC CAB retains 24 X AH-64 per ARB, while ARS equipped at 21 X AH Total 360 AH-64 Ft. Rucker and ORF – Total 120 AH-64 When new recon aircraft is fielded all ARBs (AC and ARNG) fielded at 24 X AH-64E Transfer of 2 AC CAB to ARNG saves $924m/yr ($666m/yr for AC CAB vs $204m/yr for ARNG CAB) ARNG CAB 38 UH-60, 15 HH-60, 12 CH-47 21 AH-64, 24 RQ-7, 24 MQ-1C CAB (Full-Spectrum) (x10) ARNG Fields 10 X ECAB – Transfer 2 from AC ARNG CAB retains 21 X AH-64 for each of the 10 ARB – Total 210 AH-64 Unmanned Recon Squadron (URS vs ARS in AC) uses UAS until new recon platform fielded This COA saves Army approx. $1 Billion per year ARNG maintains a 5 year ARFORGEN Cycle with 2 CABs/year home station validated by 1st Army ready for immediate deployment to the AOR Home Station Validation and Mobilization provide major additional cost savings per year


Download ppt "BRIDGING THE GAP UNTIL THE ARMY FIELDS A NEW RECON PLATFORM"

Similar presentations


Ads by Google