Presentation is loading. Please wait.

Presentation is loading. Please wait.

First attempt at using WIRED

Similar presentations


Presentation on theme: "First attempt at using WIRED"— Presentation transcript:

1 First attempt at using WIRED
Eric van Herwijnen

2 Overview Gaudi MC event server Tracking group’s reconstructed events
Test version released Future plans

3 WIRED /run1/event1.xml /event2.xml /....... /run2/event1.xml /.....
/....../...... Eventx.xml WIRED EventDumpAlgorithm (Gaudi) Sicb dataset

4 Open an MC event from Web server

5 Production plans

6 Status of simulated event production
180 k mbias events 270 k bb inclusive 7*106 total number of events simulated so far ( 1 TB data)

7 Current capacity Production centers for simulation: For analysis:
No dedicated LHCb facility CERN CSF (being phased out for us) RAL CSF IN2P3 Heidelberg For analysis: CERN RSBATCH/RSPLUS (being phased out for us)

8 New production centers
CERN- Planned by end 1999: CSF  PCSF (first production 300k events done for new magnet study, 150 k events/week) RSBATCH  Linux cluster (analysis batch) RSPLUS  LXTEST (interactive logon service) LHCb LSF cluster (corridor PC’s, 50 LHCb machines available,  75 k events/week)

9 New production centers
Outside CERN (figures for v116/117): Liverpool ( 50 times PCSF, 7500 k events/week) RAL PC farm (half the size of PCSF, ie  75 k events/week) RAL CSF ( 10 k events/week) Lyon IN2P3 ( 20 k events/week) RIO Linux farm (?)

10

11 SICB performance

12

13

14 Test release Http://lhcb.cern.ch/computing/analysis/default.htm
Download the file install.class Install jdk (from IBM) for best preformance Type java install

15 Future work Make an XML conversion service instead of an algorithm
Re-arrange hits & reconstructed tracks Improve interactivity Get feedback


Download ppt "First attempt at using WIRED"

Similar presentations


Ads by Google