Shiraz Urban Railway Organization
3
Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6 corridors approved 6 corridors approved Passengers in 2020 (phpd)Lines 17500Line 1 12500Line 2 21481Line 3 12845Line 4 7564Line 5 20223Line 6 2100000Trip generation per day Trip Vehicles % 50Private %2Motor and bicycle %22Taxi %26Bus
4
Shiraz Metro Project Lines
5
Status of Shiraz Metro Project
6
Shiraz Metro Lines StatusColor Length ( Km)Line Under Construction (Physical Progress : %52 ) ---------- 24.5Line 1 Basic Study ( EPC) (Progress : % 37 ) ---------- 14Line 2 Basic Study---------- 10Line 3 Basic Study---------- 17.2Line 4 Basic Study---------- 9.5Line 5 Basic Study---------- 14.8Line 6 90 Total Length
7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Namazi Station Valiasr station Douran Sation Total length of line one : 24.5 Km N TBM Tunneling Depot Connection line Ehsan Depot Main Depot Under construction Control center Total budget : 1.06 billion USD
8
Stations Of Line One 13 Island platform Stations Stations Side platform 7
9
Typical profile of Shiraz metro Stations
10
Characteristics of line One
11
Characteristics of Line One
12
Types of Tunneling in Shiraz metro MAIN TUNNEL– SUPPORT SYSTEM Tunnel center Road center
13
TBM Tunneling
14
NATM Tunneling
15
Cut & Cover Tunneling
16
Station's
17
Diaphragm Walls
18
Control Center
19
Depot & Workshops