Download presentation
Presentation is loading. Please wait.
Published byRosemary Welch Modified over 5 years ago
1
Introduction to the first meeting of the IPPC Review Advisory Group
DG ENV, 13 January 2006
2
2005 IPPC Implementation Report - Key findings
Delays in transposition, ongoing infringement procedures (8 MS) Limited progress in the implementation of the Directive and need to accelerate process in view of Oct 2007 deadline Description of specific implementation issues => IPPC IMPLEMENTATION ACTION PLAN
3
IPPC Implementation Action Plan
1. Full transposition 2. Monitoring progress 2007 5. Guidance 3.Implementation assessment 4. Finalisation BREFs
4
Number of permits for existing installations
No data received so far from AT, CZ, DK, DE, FR, IE, IT, LU, MT, NL and SE
5
Implementation Assessment
Intensify use of EPER to scrutinise application of the IPPC Directive Assessment of 30 installations to better understand MS implementation => study Assessment of environmental benefits of implementation => EEA assessment Upcoming assessment of “general binding rules” (study in )
6
Why a Review? Natural part of effective policy cycle
2003 Communication: Positive reaction and general call for regulatory stability But room for improvement: coverage, interpretation, legislative interactions Some call for additional scope for emission trading
7
Better regulation COM(2005) 535 IPPC Implementation Action Plan
Why a Review? Better regulation COM(2005) 535 IPPC Implementation Action Plan Lisbon agenda Thematic strategies IPPC Review => study
8
Core Objectives An ambitious review while not altering the fundamental principles, objectives and ambition of the present Directive (high level of environmental protection, integrated approach, BAT, permitting …)
9
Examine scope for legislative streamlining
IPPC Directive Landfill Directive Waste Incineration Directive Emission Trading Directive EIA Directive LCP Directive => Study
10
Develop and implement outcomes of the Thematic Strategies
Waste Clarification/extension of IPPC application to waste management? Soil Soil contamination monitoring (baseline report, monitoring during operation, final status report) ? Enhance rehabilitation obligations? Air Intensive cattle rearing? => Air Unit study 20-50 MW combustion installations?
11
Encourage industry to go beyond regulatory compliance
Incentives for innovation and enhanced deployment of environmental technologies Economic instruments (trading, taxes ...) Environmental management systems Administrative relief Voluntary schemes => Study
12
“Technical” amendments in the light of experience
Permit review and monitoring provisions Information exchange on BAT Clarification of scope, definitions, etc. Study on data gathering for impact assessment
13
Summary projects in 2006 Implementation (ENTEC)
Competitiveness (Carl Bro) Review process Env benefits (EEA) Beyond Compliance (DHV) Impacts of technical Amendments (IEEP) Streamlining (ENTEC)
14
2nd EPER reporting (June 2006) implementation reports
How? Other technical and legal input 2nd EPER reporting (June 2006) Development of guidance (2006) Member States 2nd implementation reports (Sept 2006)
15
How? IPPC Advisory Group (input studies) IPPC Advisory Group
IMPEL (enforcement) IPPC Experts Group (policy orientation) Stakeholder Hearing 2006 (public debate)
16
Expected role of Advisory Group
Present opinions and suggestions based on questionnaires Advice on key decisions Key contact points Structured dialogue for input to studies comments on deliverables Input to data collection
17
Challenges for the Advisory Group
Significant workload expected Avoid duplication of information requests Ensure close synergies between studies Ensure good circulation of information through the use of CIRCA ( Need active and responsive group
18
Possible Outputs, Timing?
Conclusion of review in 2007 with long-term vision on industrial emissions control Legislative proposal if appropriate, based on an impact assessment, unlikely to come into effect until ~ 2012 at earliest No change in short term, 2007 deadline unaffected!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.