Presentation is loading. Please wait.

Presentation is loading. Please wait.

HMA for Science Task 1 – Project Management

Similar presentations


Presentation on theme: "HMA for Science Task 1 – Project Management"— Presentation transcript:

1 HMA for Science Task 1 – Project Management
Y. Coene, Spacebel s.a. C. Gizzi, ASTRIUM-UK HMA-S Final Presentation, Geneva, 11 June 2014 HMA-S Final Presentation - 11/06/2014

2 Agenda HMA-S Final Presentation - 11/06/2014

3 Agenda (cont’d) HMA-S Final Presentation - 11/06/2014

4 Overview Introduction Activities Results Conclusions
HMA-S Final Presentation - 11/06/2014

5 Overview Introduction Activities Results Conclusions Project
Consortium Objectives Activities Results Conclusions HMA-S Final Presentation - 11/06/2014

6 Introduction - HMA Build-up
ESA EUM DLR ASI CNES CSA BNSC HMA Contributing Agencies Heterogeneous Mission Accessibility EOP-G presentation to DOSTAG 43. April 2005. Interoperability standards project HMA Standards Interfaces Initial Specifications HMA Implementation DAIL Implementation (ESA) HMA Architecture Working Group HMA I/F ESA HMA Test Bed (HMA-T, HMA-FO, HMA-S, ..) Standard specifications Standard specifications HMA WG Terms of Reference Ref. GMES-DFPR-EOPG-PR HMA I/F HMA Contributing Agencies Feedbacks Feedbacks Prototyping and Testing Standards Evolution HMA I/F CCMs Operational Implementation Projects Two track approach: operational implementations and parallel "standardisation and support activities (e.g. SW development and conformance testing)" HMA-S Final Presentation - 11/06/2014

7 Introduction Project: Consortium: HMA for Science (HMA-S)
LTDP budget, 600 KEUR (incl. CCN) Kick-Off held 22 January 2013 Consortium: Prime Contractor: Airbus Defence and Space (formerly ASTRIUM-UK) Project Mgt: Airbus DS / Spacebel (after MTR) HMA-S Final Presentation - 11/06/2014

8 Introduction - Objectives
The HMA-S project aims to further advance the HMA standardisation activities and address in particular the following interfaces: Dataset metadata (Task 3) Catalogue access (datasets, dataset series and services) (Task 4 and Task 5) Feasibility analysis (Task 7) Ordering and product download (Task 4) Processing (Task 6) Identity Management (Task 2) Provide conformance tests (CITE / ATS / ETS) for each specification. Provide open-source Demonstrators and Testbed. HMA-S Final Presentation - 11/06/2014

9 Overview Introduction Activities Results Conclusion
HMA-S Final Presentation - 11/06/2014

10 Activities (*) Since MTR HMA-S Final Presentation - 11/06/2014

11 Overview Introduction Activities Results Conclusion
HMA-S Final Presentation - 11/06/2014

12 Results Task 2: Identity Mgt Note:
ETS supporting SOAP 1.2 and SOAP 1.1. Demonstrator includes PEP and STS implementations. HMA-S Final Presentation - 11/06/2014

13 Results Task 3: Metadata Issues:
Task 3 produced 8+ Change Requests. OGC published them very late causing adoption delays. Late ESA clarification request «dateline conventions». HMA-S Final Presentation - 11/06/2014

14 Results Task 4: Dataset Series and Dataset Discovery Issues:
TEAM Engine issues were investigated by Terradue and OGC. Initial ETS delivered 6 June by Terradue Inconsistent TEAM engine version required for these ETS ? To be checked if CTL scripts provide Web interface ? HMA-S Final Presentation - 11/06/2014

15 Results Task 4 (cont’d): Ordering, Online Data Access
Note: CCN#2 deliverables (ETS for OGC ) not yet available. HMA-S Final Presentation - 11/06/2014

16 Results Task 4 (cont’d): Ordering, Online Data Access Note:
Demonstrator D4000 not yet delivered to ESA. VM being extended with Task 7 Demonstrator. CCN#2 deliverables D4700 not yet available. HMA-S.TPZ.D no longer required as per AI#84. HMA-S Final Presentation - 11/06/2014

17 Results Task 5: Dataset Series and Services Discovery Notes:
I15 EP Server (Demonstrator) being used in current FedEO Gateway implementation to host ISO19139 dataset series metadata. HMA-S Final Presentation - 11/06/2014

18 Results Task 6: Processing Issues:
OGC r1 still subject to SWG vote (Discussion Paper) OGC r1 depends on WPS 2.0 being approved. OGC WPS 2.0 SWG much slower than expected. Tasks D to D suspended since october Agreement in May 2014 to not resume these tasks. HMA-S Final Presentation - 11/06/2014

19 Results Task 7: Feasibility Analysis Issues:
OGC document being voted (30 yes votes already) CCN#2 Demonstrator currently being added. HMA-S Final Presentation - 11/06/2014

20 Results Task 8: TestBed Testbed and TEAM Engine being incrementally delivered to ESA: HMA-S Final Presentation - 11/06/2014

21 Results Task 9: Technical Coordination Notes:
HMA-S.SPB.D Coherence RIDs and feedback on draft documents produced throughout the project. HMA-S.ASU.D9000.1: SOW requirements I60 (GMLJPEG2000), I61 (INSPIRE Orthoimagery) and I62 (OpenDAP) - missing. HMA-S Final Presentation - 11/06/2014

22 Results Task 9: Technical Coordination
Updates to TM-21 underway. Draft of updates provided to ESA. Collaborative approach for remaining updates. HMA-S Final Presentation - 11/06/2014

23 Overview Introduction Activities Results Conclusion
HMA-S Final Presentation - 11/06/2014

24 Conclusion With respect to the original objectives:
Objective 1:The HMA-S project aims to further advance the HMA standardisation activities and address in particular the following interfaces … Objective 2: Provide conformance tests (CITE / ATS / ETS) for each specification. Objective 3: Provide open-source Demonstrators and Testbed. HMA-S Final Presentation - 11/06/2014

25 Results #1: Standardisation
OGC Implementation Standards (voted): OGC r8 - OpenSearch Geo and Time Extensions OGC r2 – I15 Extension Package of CS-W ebRIM Profile OGC Implementation Standards (not yet voted): OGC r4 - EO Metadata Profile of O&M OGC r4 – OpenSearch Extension for Earth Observation OGC Best Practices (voted): OGC r9 - User Mgt Interfaces for EO Services OGC – RESTful Encoding of Ordering .. for EO Products OGC – Download Service for EO Products OGC – RESTful Encoding of Sensor Planning Service for Earth Observation Satellite Tasking HMA-S Final Presentation - 11/06/2014

26 Results #1: Standardisation
OGC Best Practices (voting underway): OGC – OpenSearch Extension for EO Satellite Tasking OGC Discussion Paper (voted): OGC – OpenSearch Extension for Correlated Search OGC Discussion Paper (not voted): OGC r1 – WPS 2.0 Transactional Extension OGC Pending Documents: OGC r3 – INSPIRE Conformance Class of OGC I15 Extension Package of CS-W ebRIM Profile. OGC r1 – WPS 2.0 Asynchronous Mgt Extension HMA-S Final Presentation - 11/06/2014

27 Results #1: Standardisation
Achieved simplified versions of many HMA Protocols. Initial step set to Resource Oriented Architecture: Two RESTful bindings accepted as OGC Best Practice Further work required HMA-S Final Presentation - 11/06/2014

28 Results #1: Standardisation
HMA-S Final Presentation - 11/06/2014

29 Results #1: Standardisation
HMA-S Final Presentation - 11/06/2014

30 Results #2: Compliance Tests
Most ETS available and deployed on TEAM Engine x HMA-S Final Presentation - 11/06/2014

31 Results #2: Compliance Tests
To be completed: Baseline: OGC r8, OGC r4 ETS delivery to be checked. CCN#2: OGC HMA-S Final Presentation - 11/06/2014

32 Results #3: Open-source and Testbed
Open-Source Components: Task 3 Task 7 Task 5 HMA-S Final Presentation - 11/06/2014

33 Results #3 – Open Source Task 4 Task 5 Task 7 Task 2 Task 2/3/5
HMA-S Final Presentation - 11/06/2014

34 Results #3: Open-source and Testbed
Note yet completed: Demonstrator OGC « Download Service» (CCN#2)  Testbed deployment at ESA (.OVF files) HMA-S Final Presentation - 11/06/2014

35 Conclusion Most of the expected results achieved according to original timeline. Despite challenging OGC environment: Dependency on external votes to reach quorum. E.g. 26 out of 30 votes on OGC are external votes. Cumbersome and slow process to approve 8 change requests on OGC r3 Many specifications supported by NASA, NGA, USGS, NOAA … Comments from CEOS addressed in Task 4 (OpenSearch) Main exception: Processing (WPS 2.0) Further work required, mainly on CCN#2 related activities. Remaining work to be addressed at forthcoming Acceptance Review. HMA-S Final Presentation - 11/06/2014


Download ppt "HMA for Science Task 1 – Project Management"

Similar presentations


Ads by Google