Presentation is loading. Please wait.

Presentation is loading. Please wait.

Report of TGv – January 2007 DATE: January 2007 Author(s) January 2005

Similar presentations


Presentation on theme: "Report of TGv – January 2007 DATE: January 2007 Author(s) January 2005"— Presentation transcript:

1 Report of TGv – January 2007 DATE: January 2007 Author(s) January 2005
doc.: IEEE /xxxx January 2007 Report of TGv – January 2007 DATE: January 2007 Author(s) Name Company Address Phone Pat R. Calhoun Cisco Systems, Inc 170 West Tasman Dr., San Jose, CA 95134 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdff>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at < Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

2 Abstract Report of the meeting of TGv at the January 2007 session.
doc.: IEEE /xxxx January 2007 Abstract Report of the meeting of TGv at the January 2007 session. Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

3 Goals for January 2007 January 2007 Address Internal Review Comments (highest priority) Go to Letter Ballot Entertain new submissions Pat R. Calhoun, Cisco

4 Submissions Submissions for January Meeting
v-tgv-internal-review-comment-submissions v-tgv-internal-review-comment-submissions-sta-statistics v-comment-resolution-sta-statistics v D0.5 Comment Resolution v-cid normative-text v-comment-resolution-virtual-ap v-comment-resolution-multicast-diagnostics v-tgv-internal-reviewcomment-resolution-event-log v-comment-resolution-tgv-d5-fbms v v-tgv-internal-reviewcomment-resolution-event-log v-tgv-d5-0-comment-resolution-presence v-tgv-roaming-comment-resolution v-ecsa comment resolution (need proper file name) v-Idle Mode Operation in IEEE WLANs v-admission-control-traffic-request Pat R. Calhoun, Cisco

5 Monday Proposed Agenda
January 2007 10:30-12:30 Session 10:30-10:37 - Review IEEE patent policy 10:37-10:42 – Session Objectives 10:42-10:47 -Approve minutes from last meeting (11-06/1757r2) 10:47-10:54 - Approve Agenda 10:54-11:09 - Review weekly goals and objectives 11:09-11:30 – v-comment-resolution-sta-statistics (Qi) 11:30-11: v-tgv-internal-review-comment-submissions 11:45-12:30 - Address Internal Review Comments Recess 19:30-21:30 19:30-19: v-cid normative-text 19:45 - Review and Approve Agenda 19:45-20: v D0.5 Comment Resolution 20:05-20: v-tgv-roaming-comment-resolution Motions on spreadsheets Address Internal Review Comments Pat R. Calhoun, Cisco

6 Tuesday Proposed Agenda
January 2007 08:00-10:00 Address Internal Review Comments Recess 16:00-18:00 Pat R. Calhoun, Cisco

7 Wednesday Proposed Agenda
January 2007 08:00-10:00 08:00-08:15 – v-location-capability_network (Donghee) 08:15-08:35 – v-normative-text-proposal-qos-aware-load-balancing (Fujio) 08:35-09:20 – v-paging-power-saving-analysis-update (Qi) 09:20-10:00 – v-reede-geoloc-ofdm-simulations (Reede) Recess 13:30-15:30 13:30-14:00 – v-normative-text-presferred-channel (Kwak) 14:00-14:30 – v-normative-text-extended-channel-switch-response (Kwak) 14:30-14:50 – v-normative-text-proposal-traffic-generation-information-proactive-load-management (Moo) 14:50-15:20 – v-STA-location-capability (Donghee) 15:20-15:30 – Address Internal Review Comments (Emily) Pat R. Calhoun, Cisco

8 Thursday Proposed Agenda
January 2007 08:00-10:00 08:00-08:45 – v-Idle Mode Operation in IEEE WLANs (Qi) 08:45-09: v-admission-control-traffic-request (Stanley) 09:05-09:25 – v-fbms-termination (Donghee) 09:25-09:45 – v-leader-based-multicast (Donghee) 09:45-10:00 – Address Internal Review Comments Recess 13:30-15:30 13:30-14:15 – v-access-point-collaboration-enhancing-qos-and-spectrum-efficiency (Ashley) 14:15-14:45 – Management Objects (Kwak) 14:45-15:15 – Address Internal Review Comments 15:15-15:30 – Plans for March Adjourn Pat R. Calhoun, Cisco

9 Motion to approve TGv November 2006 minutes
January 2007 Move to approve meeting minutes in v-minutes-tgv-dallas-meeting-nov-06 Mover: Bob O’Hara Seconder: Dorothy Stanley Passes: Unanimous Pat R. Calhoun, Cisco

10 Motion to approve TGv Ad-Hoc minutes
January 2007 Move to approve December 14th, 2006 and January 11th, 2007 meeting minutes in v-minutes-tgv-Dec-06-and-Jan-2007adhoc-minutes Mover: Seconder: Passes: Pat R. Calhoun, Cisco

11 New Contribution Requests
January 2007 Donghee (???) - 1 x 15mins Fujio (11-06/1725r2) – 20 mins Emily (Paging Power Saving Analysis) – 45 mins Moo (11-07/80) – 30mins Reede (Ranging) – 30 mins Donghee (???) – 1 x 15 mins Kwak Extended Channel Switch Announcement – 30mins Preferred Channel – 30 mins Donghee 11-06/1725r0 – 20 mins ??? – 20 mins Kwak (Management Objects) – 30mins Pat R. Calhoun, Cisco

12 IEEE-SA Standards Board Bylaws on Patents in Standards
January 2005 doc.: IEEE /xxxx January 2007 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of essential patents and patent applications provided the IEEE receives assurance from the patent holder or applicant with respect to patents whose infringement is, or in the case of patent applications, potential future infringement the applicant asserts will be, unavoidable in a compliant implementation of either mandatory or optional portions of the standard [essential patents]. This assurance shall be provided without coercion. The patent holder or applicant should provide this assurance as soon as reasonably feasible in the standards development process. This assurance shall be provided no later than the approval of the standard (or reaffirmation when a patent or patent application becomes known after initial approval of the standard). This assurance shall be either: a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement either mandatory or optional portions of the proposed IEEE standard against any person or entity complying with the standard; or b) A statement that a license for such implementation will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Slide #1 Pat R. Calhoun, Cisco Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006) Pat R Calhoun, Airespace

13 Inappropriate Topics for IEEE WG Meetings
January 2005 doc.: IEEE /xxxx Inappropriate Topics for IEEE WG Meetings January 2007 Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions, or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Slide #2 Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006) Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

14 Notice to all TGv members
January 2007 Please make sure that your submissions have Stuart Kerry’s *new* address: Pat R. Calhoun, Cisco

15 Please record your attendance at:
Attendance Reminder January 2007 Please record your attendance at: (or Pat R. Calhoun, Cisco

16 TGv Comment Sub-Groups
January 2007 General (11-06/1863r2) – Emily Qi Event (11-06/1851r1) – Emily Qi, Dorothy Stanley Station Statistics (11-07/0072r0) – Emily Qi Diagnostics (11-06/1819r0) – Bob Miller, Alex Ashley Diagnostics ( r0) –Alex Ashley 4 Open Issues: Bob O’Hara: 51, 198, 213. resolutions in 11-07/0173r0 Alex: 232. resolutions in 11-07/xxxxx Multicast Diagnostics (11-06/1847r1) – Jari Jokela, Subbu Ponnuswamy FBMS (11-06/1856r0) – Allan Thomson, Qi Wang, Jari Jokela Ready to review 11-07/0123r2 (Stanley), which addresses issues 207, 219 Presence (11-06/1918r3) – Allan Thomson Ready to review 11-07/0122r1 (Stanley), which addresses issues 139, 140 Roaming Management (11-07/0053r1) – Emily Qi, Joe Epstein, John Bahr, Bob Miller Normative Text (Ganes), resolving 22, 244, 192, 241, 284 – 11-07/0093r1 vote on Thursday. Extended Channel Switch (11-07/0091r0) – Allan Thomson, Qi Wang, Victoria Poncini Motion Thursday, propose declining two issues after TGn adopts their CSA proposal Virtual AP (11-06/1834r1) – Subbu Ponnuswamy, Joe Epstein One deferred issue will be declined. Motion on Thursday. Pat R. Calhoun, Cisco

17 Strawpoll Text In favor: Not in favor: January 2007
Pat R. Calhoun, Cisco

18 STRAW POLL January 2007 Do you support use of Net Advice on designated Preferred Channels to improve STA power savings? YES _______ NO _______ ABSTAIN _______ Pat R. Calhoun, Cisco

19 January 2005 doc.: IEEE /xxxx Straw Polls January 2007 Identification of voice terminals within standard is useful Yes: No: Abstain: Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

20 January 2005 doc.: IEEE /xxxx Straw Polls January 2007 Which approaches do you like? (You can vote multiple times if you like more than one) Option 1: traffic generation information in (re)association request See Option 1 in 07/0081r1 for normative text Option 2: voice service bit in Wireless Network Management Capabilities field See Option 2 in 07/0081r1 for normative text Option 3: Admission Control Traffic Query information element in (re)association request See 06/1828r2 for normative text Option 4: ADDTS indication or provisional ADDTS Normative text to be prepared if needed Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

21 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v v-tgv-internal-reviewcomment-resolution-event-log Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

22 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-tgv-internal-reviewcomment-resolution-event-log Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

23 Motion January 2007 Move to include normative text in document 11-07/1937r1 into the TGv draft Mover: Seconder: Results: Pat R. Calhoun, Cisco

24 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-tgv-internal-review-comment-submissions-sta-statistics Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

25 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-comment-resolution-multicast-diagnostics Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

26 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-tgv-d5-0-comment-resolution-presence Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

27 Motion January 2007 Move to include normative text in document 11-07/0052r3 into the TGv draft Mover: Seconder: Results: Pat R. Calhoun, Cisco

28 Motion January 2007 Move to include normative text in document 11-07/0123r1 into the TGv draft Mover: Seconder: Results: Pat R. Calhoun, Cisco

29 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-tgv-roaming-comment-resolution, changing the resolution of issue 192 from “Counter” to “Deferred” Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

30 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-comment-resolution-tgv-d5-fbms Moved: Seconded: Yes: No: Abstain: Motion [Fails/Passes]: Pat R. Calhoun, Cisco

31 Motion Move to include 07/0118r0 into next version of TGv draft
January 2007 Move to include 07/0118r0 into next version of TGv draft Moved:_Kwak_____ Second:__________ YES _______ NO _______ ABSTAIN _______ Pat R. Calhoun, Cisco

32 Motion January 2007 Move to include normative text in document v-normative-text-extended-channel-switch-response into the TGv draft Mover: Seconder: Results: Pat R. Calhoun, Cisco

33 Motion January 2007 Move to adopt the TGv internal review comment resolutions for the comments that are marked as “Accepted”, “Counter” and “Declined” in document v-comment-resolution-from-internal-review-diagnostics-category-changes-since-dallas-meeting Mover: Seconder: Results: Pat R. Calhoun, Cisco

34 Motion January 2007 Move to include normative text in document v-STA-location-capability into the TGv draft Mover: Seconder: Pat R. Calhoun, Cisco

35 Motion January 2007 Move to include normative text in document v-comment-resolutions-cid into the TGv draft, changing “Awake” to “None” on page 4 in Table v21 Mover: Seconder: Pat R. Calhoun, Cisco

36 TGv Proposed Timeline The following time table will be used by TGv
January 2007 The following time table will be used by TGv Base line accepted: January 06 (Completed) Submissions addressing objectives: Start in March 06 TG Ad-Hoc Draft Internal Review: October 06 (Completed) Internal review created 411 comments New Timeline Initial Working Group Letter Ballot: January 07 Re-circulation Working Group Letter Ballot: May 07 Form Sponsor Ballot Pool: September 07 Initial Sponsor Ballot: March 08 Re-circulation Sponsor Ballot: May 08 Final WG/EC Approval: November 08 RevCom/Standards Board Approval: December 08 IEEE Publish: January 09 Pat R. Calhoun, Cisco

37 Work completed January 2007 Results from the Internal Review Process, of which the closed comments will be integrated into the TGv 0.07 draft Comments Submitted: 446 Number of Comments Closed: 201 The following normative text has been accepted and will be integrated into the TGv 0.08 draft v-STA-location-capability Pat R. Calhoun, Cisco

38 Attendance Attendance: Monday: 36 Tuesday: Wednesday Thursday:
January 2007 Attendance: Monday: 36 Tuesday: Wednesday Thursday: Pat R. Calhoun, Cisco

39 Output Documents 11-05/0827r10 – TGv Objectives
January 2007 11-05/0827r10 – TGv Objectives D0.07 TGv Draft Specification 11-07/0067r1 – TGv January 2007 meeting report (this document) 11-07/xxxxr0 – TGv January 2007 closing report 11-07/0076r0 – TGv January 2007 meeting minutes Pat R. Calhoun, Cisco

40 Goals for March Comment Resolution TGv Proposals
January 2007 Comment Resolution TGv Proposals Review updated objectives draft Pat R. Calhoun, Cisco

41 Adjourn Meeting adjourned at xx:xx on January 18th, 2007 January 2007
Pat R. Calhoun, Cisco


Download ppt "Report of TGv – January 2007 DATE: January 2007 Author(s) January 2005"

Similar presentations


Ads by Google