Download presentation
Presentation is loading. Please wait.
1
Location of septic drain field,
Example of Permit Plat Power pole Outline of Lot Location of septic drain field, or sprinkler heads Septic A stamped survey plat is required for any permanent structure or improve- ment: residences, garages/shops, septic systems, carports, bulkheads, hard surfaced drives, or any change in footprint to an existing permanent structure. A scaled drawing is acceptable for portable (non-permanent) structures, fences, walkways, culverts, and non-hard surfaces drives. Tank Location of any outbuildings House 1280 square feet Easement Line Water line Licensed surveyors’ Seal/stamp and signature Water meter Lot # and Street Address Culvert (show diameter and length Arrow shows required measurement (you must provide this)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.