FILLING AND VIBRATING DRY CAST BOXES

Similar presentations


Presentation on theme: "FILLING AND VIBRATING DRY CAST BOXES"— Presentation transcript:

1 FILLING AND VIBRATING DRY CAST BOXES
January 15-18, Murfreesboro, Tennessee By Tom Umek

2 What kind of equipment and working conditions make for happy production workers?
Rigid Rugged Resilient

3

4 First things first….do the cages fit?
Rigid Rugged Resilient

5

6 What about our supply of concrete?
Rigid Rugged Resilient

7

8 Preparing for the pour Rigid Rugged Resilient

9

10

11 What’s left in the mixer, on the belt or in the hopper?
Rigid Rugged Resilient

12

13

14 Filling haunches on the boxes
Rigid Rugged Resilient

15

16

17 Know what your slump is….yes slump, on Dry Cast Concrete
Rigid Rugged Resilient

18

19 Correct fill rates to insure correct and complete consolidation
Rigid Rugged Resilient

20

21 Fill in 4-6” lifts Slow down in the haunches to allow consolidation Insure consolidation by seeing the sheen near the core and jacket

22 Don’t feel you have to run all vibrator at the same time
Start the vibration with 12-18” in the bottom of the form When filling is near the next row of vibrators turn them on Once nearly full, turn of the bottom vibrators off.

23 QUESTIONS ? Rigid Rugged Resilient