SPS Planning meeting for LS2 #18 Vacuum sectors situation
Antonio Grande EN-ACE 20-Feb-2019
2
Vacuum sectors situation at 20/02/2019
Sectors Opened 29/68 Point 1 Arc 1- (2/2) 111 112 LSS 1 (8/11) 120 134 – current 135 – current 136 – current 141 – current 142 – current 143 150 Arc 1+ (2/2) 161 162 TT10 (1/1) Point 2 Arc 2- (1/1) 210 – current LSS 2 (5/6) 220 231 233 240 251 Arc 2+ (2/2) 261 262 TT20 (1/1) Point 3 Arc 3- (2/2) 311 312 LSS 3 (9/9) 321 331 332 333 334 335 336 337 351 Arc 3+ (2/2) 361 362 Point 4 Arc 4- (2/2) 411 412 LSS 4 (5/6) 420 421 425 430 435 Arc 4+ (2/2) 461 462 TI8 (1/1) Point 5 Arc 5- (2/2) 511 512 LSS 5 (5/5) 520 – current 521 – current 522 – current 530 – current 550 – current Arc 5+ (2/2) 561 562 Point 6 Arc 6- (2/2) 611 612 LSS 6 (6/8) 621 631 632 634 635 640 651 Arc 6+ (2/2) 661 662 TT60 (1/1) Point 7 TI2 (1/1) TT66 (1/1) Opened/Scheduled Delayed Next 2 weeks 29/24 2 +7 sectors have been opened since 23rd January: Vacuum sectors: 430, 462, 561, 562, 411,412,420 5 sectors opened before schedule In the following weeks 2 sectors are going to be opened Week 8 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
3
SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS1 Current and next two weeks situation Current situation Next two weeks situation 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
4
SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS2 Current and next two weeks situation Current situation Next two weeks situation 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
5
SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS3 Current and next two weeks situation Current situation Next two weeks situation 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
6
SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS4 Current and next two weeks situation Current situation Next two weeks situation 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
7
SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS5 Current and next two weeks situation Current situation Next two weeks situation 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
8
SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS6 Current and next two weeks situation Current situation Next two weeks situation 5/28/2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE
9
All comments are more than welcome but please let me know by mail
Thank you