Download presentation
Presentation is loading. Please wait.
1
Licton Springs P-Patch Food for Thought
An update for College Council 11/20/2012
2
P-Patch Update Name Change Info and Updates Lease
Licton Springs P-Patch Info and Updates Lease Final Concept Designs Construction Documents P-Patch Coordinator
3
P-Patch Location
4
P-Patch Design
5
P-Patch Construction Plan
6
P-PATCH FUNDRAISING Fundraising How Much? Why? More than $5100 needed
Construction Documents How Much? More than $5100 needed $2500 raised thus far Next deadline is January 31st: $900
7
Water Conservation Proposal
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.